Laserfiche WebLink
<br />'. . . FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION <br />FORM 500 A-93 CHAPTER 5 . BUILDING DESIGN BY COMPONENT PERFORMANCE APPROACH <br />. , ADMINISTERED BY THE DEPARTMENT OF COMMUNITY AFFAIRS <br />Non.Resldentl.1 Buildings <br />Re.ldentl.1 Buildings over 3 .torle. ALL CLIMATE ZONES <br />PROJECT NAME: ZONE: <br />ADDRESS: BUILDING CLASSIFICATIONlS): <br />CITY. ZIP CODE: BUILDING PERMIT NO.: <br />BUILDER: PERMITTING OFFICE: <br />OWNER: JURISDICTION NO.: <br /> <br /> BUILDING INFORMATION <br />WALLS ROOF/CEILING FLOORS DOORS GLASS <br />TYPE U AREA TYPE U AREA TYPE U AREA TYPE U AREA TYPE U AREA <br />Concrete (CBS) .,~ J ("~ ~ Under attic .611 ""OCfO Slab-on1lrade 6 \Ot['() Wood JIo n"'t~ Single, wall ~,y t "t:;.JI; <br />Wood frame Single Assembly Raised Wood Metal Double, wall <br />Metal frame Other: Raised concrete Insulated Single, roof <br />Insulation R-value Insulation R-value Insulation R-value Other Double, roof <br /> <br /> SYSTEMS INFORMATION <br />AIR CONDITIONEF,i HEATING SYSTEM HOT WATER <br />TYPE EFFICtEN~Y TONS TYPE EFFICIENCY BTU/H TYPE <br />Unitary & Heat Pump 1L Central & Heat Pump ?i dfJO Electric <br /><65,000 Btulh /6.&csEER ;)- < 65,000 Btu/h ~HSPF Resistance 0 <br />,,65,000 Btulh EER IPLV ~65,OOO Btu/h _COP - Dedicated Heat Pump 0 <br /> - - - Water cooied _COP Gas <br /> - <br />Water Cooled - EER - IPLV - Evaporatively cooled _COP 0 <br /> - Natural <br />Evaporatively Cooled - EER - Electric resistance _COP LPG 0 <br /> - <br />PTAC - EER - Gas/Oil (circle one) Oil 0 <br />Chillers - COP - IPLV - < 225,000/300,000 Btu/h _ AFUE - HRU 0 <br />Other: ~ 225,000/300,000 Btu/h Et Other: <br />LIGHTING Total LiQhting Wattage ';?o ~C = I. in Lighting Budget: ::L. '\ DUCTS R-value: <br /> Total Conditioned Floor Area / f,. L(!> Wattslsq,ft, (from Table 5-13) <br /> PRESCRIPTIVE MEASURES (Must be met or exceeded by all buildings.) <br />COMPONENTS SECTION REQUIREMENTS CHECK <br />Windows 502,4 Maximum of ,37 elm per linear foot of operable sash crack, X. <br />Doors 502.4 Maximum of 1,25 elm per square foot of door area, '1-.. <br />Joints/Cracks 502,4 To be caulked. gasketed, weatherstripped or otherwise sealed, X <br />Reheat 503,3 Supply air restricted to set cold/hot deck temperature to meet load of worst case zone, Resistance reheat prohibited, ..,..., <br />Ventilation 503,4 Supplied with readily accessible switch for shut-off and/or volume reduction when ventilation is not required, 1.. <br />HVAC Efficiency 503,4 Minimum efficiencies-Heating: Tables 5-4,5-5 & 5-6, Cooling: Tables 5-7A, 5-7B. 5-8 & 5-9, 'J.. <br />Transport Energy 503,5 Minimum of 8,0, 'y <br />Balancing 503,6 Provide means for balancing HVAC air svstem & water distribution svstem, 'J <br />HVAC Controls 503,7 Separate readilv accessible manual or automatic thermostat for each system, '1 <br />HV AC Ducts 503.8 Air ducts, fittings, mechanical equipment and plenum chambers shall be mechanically attached, sealed, <br /> 503,9 insulated and installed in accordance with the criteria of sections 503,8, 503,9 and 503,10. J <br /> 503,10 <br />Piping Insulation 503,11 In accordance with Table 5-10. ." <br />Water Heaters 504,2 Automatic electric storage water heaters s 120 gallons and gas & oil-tired storage water heaters s 75,000 BtuIh shall <br /> meet performance minimums in Table 5-11. Electric> 120 gallons: standby loss < .3O+27Ny. Gas> 75,000, Oil> l:j, <br /> 105,000: E .78. Standby loss 1,30 + 114NT' Gas, Oil> 155,000: E,.78, standby loss 1.30 + 951Vy. <br />Swimming Pools 504,2 Spas & heated pools must have covers, Non-commercial pools must have pump timer, lJil <br />& Spas Gas spa & pool heaters must have minimum thermal efficiency of 78%, <br />Hot Water Pipe 504,4 Piping heat loss is limited to 17,5 Btu/h linear foot of pipe for recirculating systems (see Table 5-12), l <br />Insulation <br />Water Fixtures 504,5 Water flow restricted to maximum of 3 gpm at 80 psig; toilets maximum 3,5 gallon flush, " <br /> Public lavatory fixture maximum flow of ,5 gpm or ,5 gallon if has self.closing valve, <br />Lighting 505,1 Lighting power budgets are listed in Table 5-13, Minimum Ballast Efficacy Factors are listed in Table 5-14, 'I. <br /> <br />Uo wall Allowable ,. ",) {) Uo wall Actual . -:.-" , If complying under the provisions of S, 502,2 enter the combined Uo values for the entire envelope <br />Uo roof/ ceiling Allowable . to Uo rooll ceiling Actual . b ~ in this section, <br />Uo floor Allowable Uo floor Actual Uo envelope Allowable Uo envelope Actual <br />OTTV wall Allowable )D..... OTTV wall Actual I'ir U <br />OTTV roof/ceiling Allowable OTTV rooll ceiling Actual <br /> <br />Compliance with Chapter 5was demonstrated by a Prescriptive Measures methodology: <br />D 508.0 (a) Detached commercial buildings D 50B.0 (b) Skyboxes or sports stadium buildings <br />less than 100 square feet. that are used only seasonally, <br /> <br />I hereby certify that t <br />with the Florida Ene <br />PREPARED BY: <br />I hereby certify that his buildi i <br />I <br />OWNERlAGENT~ <br /> <br /> <br />D 508.0(c) Traffic safety <br />control towers <br /> <br />Review of plans and spec~ications covered by this calculation indicates compliance w~h the <br />Florida Energy Code, Before construction is completed, this building will be inspected for <br />compliance in accordance with Section 553,908, F,S, <br />BUILDING OFFICIAL: <br /> <br />DATE: <br />