<br />Department of Community Affairs - FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION
<br />FORM 600A-93 Residential Whole Building Performance Method A CENTRAL~ 6
<br />
<br />
<br />PROJECT NAME:
<br />AND ADDRESS:
<br />
<br />, ~.,.....,.
<br />
<br />1. New construction or addition
<br />2. Single family detached or Multifamily attached
<br />3. If Multifamily-No. of units covered by this submission
<br />4. If Multifamily, is this a worst case (yes / no)
<br />5. Conditioned floor area (sq, ft,)
<br />6. Predominant eave overhang (ft,)
<br />7. Porch overhang length (ft,)
<br />8. Glass type and area:
<br />a. Clear glass
<br />b, Tint, film or solar screen
<br />9. Floor type and insulation:
<br />a. Slab on grade (R-value + perimeter)
<br />b, Wood, raised (R-value + sq, ft.)
<br />c, Concrete, raised (R-value)
<br />10. Net Wall type, area and insulation:
<br />a. Exterior: 1, Concrete block (Insulation A-value)
<br />2. Wood frame (Insulation A-value)
<br />3. Steel frame (Insulation A-value)
<br />4. Log (Insulation A-value)
<br />
<br />b. Adjacent: 1. Concrete block (Insulation A-value)
<br />2. Wood frame (Insulation A-value)
<br />3. Steel frame (Insulation A-value)
<br />4. Log (Insulation R-value)
<br />11. Ceiling type, area and insulation:
<br />a, Under attic (Insulation A-value)
<br />b. Single assembly (Insulation A-value)
<br />12. Air distribution system:
<br />a. Ducts (Insulation + Location)
<br />b, Air Handler( Insulation + Location)
<br />13. Cooling system:
<br />(Types: central-split, central-single pkg., room unit, PTAC" none)
<br />
<br />14. Heating system:
<br />(Types: heat pump, elec. strip, nat. gas, L,P, gas, room or PTAC, none)
<br />15. Hot water system:
<br />(Types: elec" natural gas, solar, LP. gas, none)
<br />16. Hot Water Credits:
<br />a. Heat Aecovery (HA)
<br />b, Dedicated Heat Pump(DHP)
<br />17. InfUtration practice: 1,2 or 3
<br />18. HYAC Credits (Type in Letter designation: CF-Ceiling Fan, CV-Cross vent,
<br />HF-Whole house fan, RS-Attic radiant barrier, MZ-Multizone)
<br />,19. EPI (must not exceed 100 points)
<br />
<br />a. Total As-Built points
<br />b, Total Base points
<br />
<br />EPI = Total As.Buin points X 100
<br />Total Base polnts
<br />
<br />I hereby certify that the plans and spa . 'cations covered by the calculation are in compliance with the
<br />Florida Energy COd,. "\
<br />PREPARED BY: W ~#~ .'-~''''__ ___ _ DATE:./.."~"'" ~ ~l,,~,
<br />I hereby certify that. t~jS ~ildJ!'ilis in rlPlian-.c;-';'.ith t.h.';.F'I~..n.Cd;;-E.;;-e.~gy'c. ..;de. . ~- ---~
<br />
<br />OWNER AGENT: _!VL~C~.A~_ .," _ __ _'H __ DATE: _~~ 1,/. f ,
<br />
<br />-1-
<br />
<br />1.
<br />2.
<br />3.
<br />4. --..--
<br />5. f r7~ sq. ft.
<br />6. ,.,:J} ft.
<br />7. ft.
<br /> Single Pane Double Pane
<br />8a. sq, ft. sq. ft,
<br />8b. ___sq. ft. 1'-"/ sq. ft.
<br />9a. R= 0 I. ft.
<br />9b. R= sq. ft.
<br />9c. R= sq. ft.
<br />10a-1 R= sq. ft.
<br />10a-2 R= , I 9 t.( <-'
<br /> . sq. ft.
<br />10a-3 R= sq. ft.
<br />10a-4 R= sq, ft. --
<br />10b-1 R= sq, ft,
<br />10b-2 R= " U~ sq. ft.
<br />10b-3 R= sq. ft. ----
<br />10b-4 R= sq. ft.
<br />11a. R= 1.. '-- 1)-"
<br /> , '1.4 sq. ft, --
<br />11b. R= sq. ft.
<br />
<br />12a.
<br />12b.
<br />13a.
<br />13b.
<br />13c.
<br />14a.
<br />14b.
<br />14c.
<br />15a.
<br />15b.
<br />16a.
<br />16b.
<br />17.
<br />18.
<br />
<br />R= ~,__ (COnd./u~~
<br />R= , __ (cond./uncond.)
<br />Type: (r......J.r:.....,. I
<br />SEERlEERlCOP: / O. 'J )
<br />Capacity: _7' f",() 9 :..)
<br />Type: f/t,~.,J 1- ..'~'-/'
<br />HSPF/COP/AFUE: /,' '
<br />Capacity: ---3..1." 9):)
<br />Type: r . '. , ,-
<br />EF: ,'") ,
<br />
<br />1-
<br />tf . :-v
<br />
<br />
<br />DATE:
<br />
|