<br />Department of (, mmunity Affairs - FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION
<br />FORM 600A-93 Residential Whole Building Performance Method A CENTRAL 4 5 6
<br />
<br />OWNER:
<br />
<br />
<br />BUILDER:
<br />PERMITTING
<br />OFFICE:
<br />PERMIT NO. 3 6
<br />
<br />PROJECT NAME:
<br />AND ADDRESS:
<br />
<br />1. New construction or addition
<br />2. Single family detached or Multifamily attached
<br />3. If Multifamily-No. of units covered by this submission
<br />4. If Multifamily, is this a worst case (yes / no)
<br />5. Conditioned floor area (sq. ft.)
<br />6. Predominant eave overhang (ft.)
<br />7. Porch overhang length (ft.)
<br />8. Glass type and area:
<br />a. Clear glass
<br />b. Tint, film or solar screen
<br />9. Floor type and insulation:
<br />a. Slab on grade (R-value + perimeter)
<br />b. Wood, raised (R-value + sq. ft.)
<br />c. Concrete, raised (R-value)
<br />10. Net Wall type, area and insulation:
<br />a. Exterior: 1. Concrete block (Insulation R-value)
<br />2. Wood frame (Insulation R-value)
<br />3. Steel frame (Insulation R-value)
<br />4. Log (Insulation R-value)
<br />
<br />b. Adjacent: 1. Concrete block (Insulation R-value)
<br />2. Wood frame (Insulation R-value)
<br />3. Steel frame (Insulation R-value)
<br />4. Log (Insulation R-value)
<br />11. Ceiling type, area and insulation:
<br />a. Under attic (Insulation R-value)
<br />b. Single assembly (Insulation R-value)
<br />12. Air distribution system:
<br />a. Ducts (Insulation + Location)
<br />b. Air Handler( Insulation + Location)
<br />13. Cooling system:
<br />(Types: central-split, central-single pkg., room unit. PTAC., none)
<br />
<br />14. Heating system:
<br />(Types: heat pump, elec. strip, nat. gas, L.P. gas, room or PTAC, none)
<br />15. Hot water system:
<br />(Types: elec., natural gas, solar, L.P. gas, none)
<br />16. Hot Water Credits: ·
<br />a. Heat Recovery (HR)
<br />b. Dedicated Heat Pump(DHP)
<br />17. Infiltration practice: 1, 2 or 3
<br />18. HV AC Credits (Type in Letter designation: CF-Cei/ing Fan, CV-Cross vent,
<br />HF.Whole house fan, RS-Attic radiant barrier, MZ-Multizone)
<br />19. EPI (must not exceed 100 points)
<br />
<br />a. Total As.Built points
<br />b. Total Base points
<br />
<br />r;;PI = Total.As.Bulltpolnts X 100
<br />T ot31 Base points
<br />
<br />, he:eby certify that t'\C plans ~:.'d :,;pecifJ7tions covered by the c31culation are in compliance with the
<br />Flenda Energy Ce.de / l /') ,/ ,I . _
<br />
<br />PRl;:Pi'.RED!;1Y: J(/J:'t./<('/:"-:'.c"" ,.(..;,,:<:+__,___ DATE:.L/- /j -?
<br />1 h~rPb'l ...~,..,~ly th~lt t!""r~1"':'''' '])!'1' >. (;c:-'i- ;':-."~ c. 'vi1.; I ,'il:, r:1.~J'j~~<1 Energy Code. .
<br />( /- ... " . /,/ 1'; '- 9]
<br />" O"Iv"":Ell "'<(~'r\1T- 1.1' " ,.i'< /" '..t~.... "',';~." :_..., _..____.______ DATE: L.L-+:L.!,_~_._ .
<br />
<br />
<br />/'v
<br />CLIMATE 0 D D
<br />ZONE: 4 LJ 5 6
<br />JURISDICTION NO.: ~
<br />
<br /> ~ Please Type CK
<br />1. A/ f--uJ
<br />2. ~r,' u C /1-
<br />3. /
<br />4.
<br />5. I '13 LJ sq. ft.
<br />6. 1-33 ft.
<br />7. <;'" ft.
<br /> Single Pane Double Pane
<br />8a. sq. ft. sq. ft.
<br /> J7? of
<br />8b. sq. ft. sq. ft.
<br />9a. R= () , 170 I. ft.
<br />9b. .R= , sq. ft.
<br />9c. R= , sq. ft.
<br />10a-l R= sq. ft.
<br />10a-2 R= I I 9()S' sq. ft.
<br /> , . ,
<br />1 Oa-3 R= sq. ft.
<br />10a-4 R= sq. ft.
<br />1 Ob-l R= sq. ft.
<br />10b-2 R= IJ ~...~d- sq. ft.
<br />10b-3 R= sq. ft.
<br />10b-4 R= . sq. ft.
<br />lla. R= z..z. 1'13'1 sq. ft.
<br />l1b. R= sq. ft.
<br />12a. R= ~ ,__ (COndJ@
<br />12b. R= , (condJuncond,)
<br />13a. Type: C (-IV f{_r:' 4 I .
<br />13b. SEERlEERlCOP: /0'(0
<br />13c. Capacity: !1 ~
<br />14a.
<br />Type: ~/l- ""f-)
<br />14b. HSPF/COP/AFUE: ' (~
<br /> ..:sf, oJ) ..
<br />14c. Capacity:
<br />15a. Type: C/(,,,-f .
<br />15b. EF: f/
<br />168.
<br />16b.
<br />17. ~
<br />18. CP. Ct/
<br /> ,
<br />119. 77 I
<br />19a. ft! ~~l/. LI
<br />19b. C/, DC;, ~
<br />
<br />Review of plans and specifications covered by this calculation indicates compliance with
<br />the Florida Energy Code. Belore strucr is completed. this building will be inspected
<br />for compliance in accordance i 53,908. F,S,
<br />
<br />BUILDING OFFICIAL:
<br />DATE:
<br />
<br />
|