Laserfiche WebLink
<br />ELEVATION CERTIFICATE ~~~,~/:Ja~oN.-?~tf <br /> <br />FEDERAL EMERGENCY MANAGEMENT AGENCY <br />NATIONAL FLOOD INSURANCE PROGRAM <br />ATTENTION: Use of this certificate does not provide a waiver of the flood insurance purChase requirement. This form is used only to <br />provide elevation information necessary to ensure compliance with applicable community floodplain management ordinances, to <br />determine the proper insurance premium rate, and/or to support a request for a Letter of Map Amendment or Revision (LOMA or LOMR). <br />Instructions for completing this form .can be found on the fol.!owing pages. <br /> <br />SECTION A PROPERTY INFORMATION <br /> <br />FOR INSURANCE COMPANY USE <br />POLICY NUMBER <br /> <br />BUilDING OWNER'S NAME <br />$, <br /> <br /> <br />OODHAM <br /> <br />STREET ADDRESS (Including Apt., Unit, Suite and/or Bldg. Number) OR P.O. ROUTE AND BOX NUMBER <br />525/ SCOT/,4 <br /> <br />OTHER DESCRIPTION (lot and Block Numbers, etc.) <br /> <br />COMPANY NAIC NUMBER <br /> <br />CITY <br />Zt;;PHYR/-IILL S <br /> <br />STATE <br />R <br />SECTION B FLOOD INSURANCE RATE MAP (FIRM) INFORMATION <br /> <br />ZIP CODE <br />33S' <br /> <br />Provide the following from the proper FIRM (See Instructions): <br /> <br />I. COMMUNITY NUMBER <br /> <br />2. PANEL NUMBER <br /> <br />3, SUFFIX <br /> <br />4. DATE OF FIRM INDEX <br /> <br />5. FIRM ZONE <br /> <br />6 BASE FLOOD ELEVATION <br />(in AO Zones. use depth) <br /> <br />~Ff <br /> <br />/2.02-35 <br /> <br />00 c> S- <br /> <br />~ <br /> <br />12-:/7-9'/ <br /> <br />,1-F <br /> <br />7. Indicate the elevation datum system used on the FIRM for Base Fiood Elevations (BFE): [!{NGVD '29 [J Other (describe on back) <br />8. For Zones A or V, where no BFE is provided on the FIRM, and the community has established a BFE for this building site, indicate <br /> <br />the community's BFE: I I I ~~.l:::J feet NGVD (or other FIRM datum-see Section B, Item 7), <br /> <br />SutJQ...yor SECTION CBUILDING ELEVATION INFORMATION <br /> <br />1. Using the Elevation Certificate Instructions, indicate the diagram number from the diagrams found on Pages 5 and 6 that best <br />describes the subject building's reference level ,5" , <br />2(a). FIRM Zones A 1-A30, AE, AH, and A (with BFE), The top of the reference level floor from the selected diagram is at an elevation <br /> <br />of I I I 18151.LlI feet NGVD (or other FIRM datum-see Section B, Item 7). <br />(b), FIRM Zones V1-V30, VE, and V (with BFE). The bottom of the lowest horizontal structural member of the reference level from <br /> <br />the selected diagram, is at an elevation of I I I I I I,U feet NGVD (or other FIRM datum-see Section B, Item 7), <br />(c). FIRM Zone A (without BFE), The floor used as the reference level from the selected diagram is LlJ, LJ feet above 0 or <br /> <br />below 0 (check one) the highest grade adjacent to the building, <br /> <br />(d), FIRM Zone AO, The floor used as the reference level from the selected diagram is LU.U feet above 0 or below 0 (check <br />one) the highest grade adjacent to the building. If no flood depth number is available, is the building's lowest floor (reference <br />level) elevated in accordance with the community's floodplain management ordinance? 0 Yes D No [J Unknown <br /> <br />3. Indicate the elevation datum system used in determining the above reference level elevations: la'NGVD '29 D Other (describe <br />under Comments on Page 2), (NOTE: If the elevation datum used in measuring the elevations is different than that used on <br />the FlAM (see Section B, Item 7J, then convert the elevations to the datum system used on the FIRM and show the conversion <br />equation under Comments on Page 2.) . <br />4. Elevation reference mark used appears on FIRM: 0 Yes B"No (See Instructions on Page 4) <br /> <br />5, The reference level elevation is based on: g- actual construction 0 construction drawings <br />(NOTE: Use of construction drawings is only valid if the building does not yet have the reference level floor in place, in which <br />case this certificate will only be valid for the building during the course of construction. A post-construction Elevation Certificate <br />will be required once construction is complete.) <br /> <br />6, The elevation of the lowest grade immediately adjacent to the building is: I I I 181=1 1.13J feet NGVD (or other FIRM datum-see <br />Section B, Item 7). <br /> <br />SECTION D COMMUNITY INFORMATION <br /> <br />1, If the community official responsible for verifying butlding elevations specifies that the reference level indicated in Section C, Item 1 <br />is not the "'owest floor" as defined in the community's floodplain management ordinance, the elevation of the building's "lowest <br /> <br />floor" as defined by the ordinance is: I I I I I I.U feet NGVD (or other FIRM datum-see Section B, Item 7), <br /> <br />2, Date of the start of construction or substantial improvement <br /> <br />FEMA Form 81 -31, MA Y 90 <br /> <br />REPLACES ALL PREVIOUS EDITIONS <br /> <br />SEE REVERSE SIDE FOR CONTINUATION <br />