My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
94-3790
Zephyrhills
>
Building Department
>
Permits
>
1994
>
94-3790
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2009 12:05:04 PM
Creation date
5/12/2006 9:01:59 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Building Department - Date
1/10/1994 12:00:00 AM
Permit #
94-3790
Building Department - Name
WAL MART
Address
GALL BV
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />. <br /> <br />.. <br /> <br />WAL~RTCONTRACTP~OPOSAL <br /> <br />DATE: December 27. 1993 <br /> <br />SUbmitted to: John Mann ing <br />Judith A. Sooth <br />HVAC Contract Administrator <br />Phone: 501-273-8524 <br /> <br />Submitted by: S C 0 etA. S w 1 she r <br />COlQnial Me~hanical Inc. <br />. <br />804 Pinell.. St.. <br /> <br />Clearwater, Fl 34616 <br /><< ,"'. <br />(814) 443-5"541 . <br /> <br />WOft< to be performed at: Waf-Mart Store. 706. In Ze p her hill s. 'F'l. <br /> <br />Contractor hereby proposed to fumish the materiaJs and perform the labor necessary for the wotk outJlned and I' <br />specified in the Scope ot WOf'k and Specifications attached her.to and made a pan hereof. <br /> <br />The work set out Will commence on or before .J II. n 11 A r y 7 r ] Q <<;) 4 <br />and above shaH be compfeted and operabte not Iatet than . r ~ n 1I.llt r y , 2 ~ 1 <<;) <<;) 4 . provicted that, <br />at the option of WAL-MAAT, reasonable adjustments as to the time schedule may be made for strikes, accident., <br />and other delays beyond Contractor's cancro!. , Conttactot ahaU coordinate its WOIk SChedule with WAL.MARrS <br />Store Manager. The aboVe work is to be pel10rmed tor the kJmp sum amount of $ 1 2 , ~ 0 0 00 . <br />with payment to be made as follows: 50 percent of Contract Price within 30 days of receipt of Invoice. The <br />remainder of the contract price when all deficiencies are corrected and projec:t accepted. 00 NOT FORWARD <br />INVOICE FOR FINAL PAYMENT WITHOUT SIGNEe RELEASE FOR FINAL PAYMENT DOCUMENT, <br />CERTIFICATE OF INSURANCE AND FINAL PAYMENT RELEASE OF LIEN. <br /> <br />Any alteration or deviation from the above Scope of Wotk and Specifications shan be made only upon written <br />Change Orders as approved by WAL-MART, and will therefore become an add or deduct amount to tne sum set <br />out herein. <br /> <br />If Contractor fails to perfOrm satisfactorily to comptete the Contract within the Contract time allotted, Wat-Mart <br />shall have the right to terminate this contract and finish the work. and the Contractor ahall reimburse Wat-Mart fOr <br />any and all costs incurred as a result of the Contraao(s failure to perform. <br /> <br />contractor warrants that all material is to be as specified, and all work is guaranteed, to be performed in a <br />woIkmanlike manner acceptable to WAL-MART, which shall be the sole judge of quality 0' materials and WOt'k. In <br />the event the materials or WOIk proves to be unacceptab'e prior to the time payment I, due, upon r~ of <br />written notice from WAL-MART, Contractor shall have .1Q days to correct the defeat at its own expense, with <br />payment then due upon completion of the correction(s). It Contractor fails to CO"ect satisfactorily within the time <br />speci(I8Cf, WAL-MART Shalt have the right to correct the defects and deduct the COI1. thereof from the amount <br />owed to Contractor and to c:oaea from Contractor any COst of correction of the defects in excess of the amount <br />owed the Contractor. In the event that defects In the materials or work are dlacovered by WAL-MART after <br />paying Contractor the above sum and within a65. days of the date of final completion and acceptance of the wOlk, <br />then, upon ree. of written notice from WAL.MART. Contractor shaJI have.1Q days to correct the defects at its <br />own 8XpenM. If Contractor 'ails to correct satisfactorily, within the time specified, WAL-MART shaH have the <br />right to cure the defects, and Contractor shall reimburse WAL-MART for any and aU cost. Incurred therein. <br /> <br />Revised 03116193 <br /> <br />Page 02 <br /> <br />10'd <br /> <br />c6c61vvf:lS16 <br /> <br />01 SlJ~~lNOJ - "8N3 1~-~ l~~ c0:~1 P661-61-~r <br />
The URL can be used to link to this page
Your browser does not support the video tag.