My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
94-3861
Zephyrhills
>
Building Department
>
Permits
>
1994
>
94-3861
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2009 12:04:47 PM
Creation date
5/15/2006 9:06:53 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Building Department - Date
2/2/1994 12:00:00 AM
Permit #
94-3861
Building Department - Name
ZEPHYR NEWS
Address
38333 5TH ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />BID SPECIFICATION <br /> <br />Pa.ge. 1 <br /> <br />A ~d B SERVICES o~ CENTRAL FLORIDA INC <br /> <br />Da.t.e.: 02/14/94 <br /> <br />Qu.o.t.a...t.Lon.: 0008 <br /> <br />ZEPHYRHILLS NEWS <br />PAUL LINDSEY <br />333 WEST HIGHWAY 54 <br />lEPHYRHILLS FLORIDA 33540 <br /> <br />T~e.phon.e.: 782-1558 <br /> <br />DESCRIPTION: <br /> <br />PROPOSE TO CHANGE OUT THE EXIXTING 5 TON YORK HEAT PUMP <br />CONDENSING UNIT WITH A 5 TON RHEEM HEAT PUMP MODEL # RPKA060JAS <br />UNIT WILL BE CONNECTED TO THE EXISTING ELECTRICAL AND PIPING <br />SYSTEM. <br /> <br />MANUFACTURES WARANTEE PROVIDED IS 5 YEARS ON THE COMPRESSOR AND 1 <br />YEAR ON THE ELECTRICAL COMPONENTS ADDITIONALY THE COMPRESSOR CAN <br />BE EXTENDED THROUGH THE 10TH YEAR FOR AN ADDITIONAL $150.00 <br /> <br />EXTRA WORK TO BE INCLUDED BY INSTALLER: WE WILL SEAL DUCTING IN <br />THE CEILING WHERE IT IS LOOSE AND INSULATE THE SUCTION LINE FROM <br />THE CONDENSING UNIT TO WHERE IT PENETRATES THROUGH THE WALL. WE <br />WILL CLEAN THE EVAPORATER COIL AND INSURE THAT THE DRAIN IS OPEN <br />AND FUNCTIONING PROPERLY. <br /> <br />WHILE PREPAIRING OUR PROPOSAL WE FOUND THE AIR HANDLING UNIT IN <br />POOR CONDITION DUE TO RUST THROUGH OF THE DRAIN PAN AND OUTER <br />CASE THE EVAPORATER COIL IS IN BAD CONDITION AND SUPPORTS ARE <br />RUSTING THROUGH. IT IS OUR RECOMENDATION THAT THE AIR HANDLING <br />UNIT BE REPLACED IN THE NEAR FURTURE AS THIS DIRECTLY EFFECTS THE <br />LIFE OF THE COMPRESSOR. <br />WE CAN PERFORM THIS DURING THE CONDENSING UNIT CHANGE OUT FOR THE <br />ADDITIONAL SUM OF $1200.00 <br /> <br />ALL MATERIAL IS GUARANTEED TO BE AS SPECIFIED AND THE ABOVE WORK <br />TO BE PERFORMED IN ACCORDANCE WITH DISCUSSED SPECIFICATIONS AND <br />COMPLETED IN A SUaSTANTIAL WORKMANLIKE MANNER FOR THE SUM OF <br />$1862.00 <br /> <br />PAYMENT IS TO BE MAVE U~MPLET~ .. <br />RESPECTFULLY SUBMITTED. ~1 ~ <br /> <br />DATE 2-Jt-Cf1 <br /> <br />THE ABOVE PRICES, SPECIFICATIONS AND CONDITIONS ARE SATISFACTORY <br />AND ARE HEREBY ACCEPTED. YOU ARE AUTHORIZED TO DO THE WORK AS <br />SPECIFIEV. PAYMENT WILL B~S~TL7rEV ABOVE. <br /> <br />ACCEPTANCE OF PROPOSAL. ~ DATE ;;Jjlb[q,y <br /> <br />o <br />
The URL can be used to link to this page
Your browser does not support the video tag.