Laserfiche WebLink
<br />SECTION E CERTIFICATION <br /> <br />This certification is to be signed by a land surveyor, engineer, or architect who is authorized by state or local law to certify elevation <br />information when the elevation information for Zones A1-A30, AE, .\H, A (with BFE),V1-V30,VE, and V (with BFE) is required. <br />Community officials who are authorized by local law or ordinance to provide floodplain management information, may also sign the <br />certification. In the case of Zones AO and A (without a FEMA or cc-mmunity issued BFE), a building official, a property owner, or an <br />owner's representative may also sign the certification. <br /> <br />Reference level diagrams 6, 7 and 8 - Distinguishing Features-If the certifier is unable to certify to breakaway/non-breakaway wall, <br />enclosure size, location of servicing equipment, area use, wall openings, or unfinished area Feature(s), then list the Feature(s) not <br />included in the certification under Comments below. The diagram number, Section C, Item 1, must still be entered. <br /> <br />.. <br /> <br />I certify that the information in Sections Band C on this certificate represents my best efforts to interpret the data available. <br />I understand that any false statement may be punishable by fine or imprisonment under 18 U.S. Code, Section 1001. <br /> <br />CERTIFIER'S NAME <br />DAVID G. ARMSTRONG <br /> <br />#4970 <br /> <br />LICENSE NUMBER (or Affix Seal) <br /> <br />P.L.S. <br /> <br />TITLE <br /> <br /> <br />COMPAN" NAME <br />C. FRED DEUEL & ASSOCIATES, INC. <br />CITY <br /> <br />STATE <br /> <br />ZIP <br /> <br />ZEPHYRHILLS FL 33541 <br />DATE PHONE <br />(813) 782-6717 <br /> <br />e for: 1) community official, 2) insurance agent/company, and 3) building owner. <br /> <br />COMMENTS: <br /> <br />ON <br />SLAB <br /> <br />A <br />ZONES <br /> <br />V <br />ZONES <br /> <br /> <br />wr,H <br />BASE.,'ENT <br /> <br />A <br />ZONES <br /> <br /> <br />ON PILES, <br />PIERS, OR COLUMNS <br /> <br /> <br />BASE <br />FLOOD <br />~ <br /> <br />The diagrams above illustrate the points at which the elevatic 1S should be measured in A Zones and V Zones. <br />Elevations for all A Zones should be measured at the top of the reference level floor. <br />Elevations for all V Zones should be measured at the bottom of the lowest horizontal structural member. <br /> <br />'age 2 <br />