My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
94-4232
Zephyrhills
>
Building Department
>
Permits
>
1994
>
94-4232
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2009 12:03:29 PM
Creation date
6/2/2006 9:12:18 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
94-4232
Building Department - Name
HALIKEY,MICHAEL
Address
6563 LANE DR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />PAUL SCHAPER CONSTRUCTION CO. <br /> <br />RESIDENTIAL & COMMERCIAL <br />Registered Building Contractor RB 0032524 <br />Registered Roofing Contractor RC 0056763 <br /> <br />11250 South Highway 98, Dade City, Florida 33525 <br />Phone # (904) 567-8580 <br />Bonded and Insured <br /> <br />PROPOSAL FOR: <br /> <br />Phone:813-626-5096 DATE: 6-28-94 <br /> <br />NAME: <br /> <br />MR. MICHEAL HALIKTAKIS <br /> <br />JOB NAME: ABC HOME HEALTH SERVICES <br />6563 LANI DR. <br />ZEPHRYHILLS, FL. <br /> <br />We hereby submit specifications and estimates for: <br /> <br />RENOVATIONS AND EXPANSION OF OFFICE SPACES AS PROVIDED BY <br />ABC HOME HEALTH SERVICES, DATED 6-14-94 LABLED " FINAL " <br /> <br />INCLUDING: <br />- NEW WALLS WITH 2 X 4 FRAME ON 16" CTR. <br />- INSTALLATION OF ELECTRIC AND TELEPHONE LINES AS SHOWN <br />- DOOR OPENINGS AND ALTERATIONS AS SHOWN <br />- DRYWALL FINSHED AND TEXTURED TO MATCH <br />- CEILING REPAIRS WITH MATCHING TEXTURE FINISHES <br />- REUSE AND ADD NEW HOLLOW CORE LUAN DOORS AS SHOWN <br />- INSTALLATION OF FORMICA WORK SURFACE <br />- ALTERATION OF EXISTING BATH AREA ( ACCD. TO PASCO BLDING DEPT.) <br />HANDICAP COMODE <br />HANDICAP GRAB BAR AT 33" HEIGHT <br />2/8 WIDE OUT SWING DOOR <br />- INSTALL MATCHING BASE BOARDS <br />- 1 X 12 SHELF SECTIONS AS SHOWN <br />- PRIMING AND PAINTING OF DISTURBED, NEW WALLS AND TRIM <br />- STAIN AND SEAL DOORS, TOTAL PAINT ALLOWANCE $ 1,110.00 <br />SUPPLY GLUE AND INSTALL OWNERS APPROX 400 YDS CARPET <br />- ESTIMATED COMPLETION TIME: 4 WEEKS ( 2 PHASES ) <br />- ALL TRASH REMOVED - PERMIT INCLUDED <br /> <br />STIl\II..T Au~" ''f"'+ <br /> <br />TOTAL COST <br /> <br />$ <br /> <br />16,990.00 <br /> <br /> <br /> <br />PH <br />ASE <br />ENT PHASE 2 <br />.00 AT COMPL <br /> <br />$. t. 0 Cl ~. 00 f\" C. 0 n'\ ft l.i: T I 0"-3 f> HAS f' 1. <br /> <br />8^ 1. AI.) Co;: A"f 'a M PI.a!'T Co~ P#I AS E 2. <br /> <br />SCHEDULE <br />AT COMMENCEMENT <br />OMP <br /> <br /> <br />CONTRACTOR <br /> <br />ACCEPTED: <br /> <br />SIGNATURE <br /> <br /> <br />DATE: <br /> <br />i--Is:.CJ1- <br />
The URL can be used to link to this page
Your browser does not support the video tag.