Laserfiche WebLink
<br />( r. <br /> <br />13.1.4 Deductibles: Fi~e. extended coverage. vandalism and malicious mischief and all other perils. $500.00. <br />Any and all deductible losses shall be borne by the Contractors in the same portion that the amount of each Contractors <br />loss bears to the total loss to all contractors on the Project. Uninsured losses shall be borne by each contractor individually. <br />13.1.5 This insurance shall include the interests of the Owner, the Contractor, Subcontractors, and <br />Su b-subcontractors. <br />13.2 Any loss insured under Paragraph 13.1 is to be adjusted with Owner and made payable to the Owner as trustee <br />for the parties. as their interests may appear. <br /> <br />.,. I. '.,. <br /> <br />"'::., <br /> <br />ARTICLE XIV CHANGES IN THE WORK <br /> <br />14.1 Owner, without invalidating the Agreement, may order changes in the Work consisting of additions. deletions. <br />or modifications, the Project Sum and the Time Limits being adjusted accordingly. All such changes in the Work shall <br />be authorized by written change orde't signed by Owner. <br />14.2 The Project Sum and the Time Limit may be changed only by change order mutually acceptable to Owner and <br />Contractor. <br />14.3 The cost or credit to Owner from a change in the Work shall be mutually acceptable to Owner and Contractor. <br /> <br />ARTICLE XV CORRECTION OF WORK <br /> <br />15. I Contractor shall correct any Work that fails to conform to the requirements of the Contract Documents where <br />such failure to conform appears during the progress of the Work. and shall remedy any defects Que to faulty materials, <br />equipment or workmanship which appear within a period of one year from the date of Substantial Completion of the Project. <br />or within such longer period of time as may be prescribed by law, or by the terms of any applicable special guarantee <br />required by the Contract Documents. The provisions of this Article shall apply to Work done by Subcontractors, as well <br />as to Work done by direct employees of Contractor. <br /> <br />ARTICLE XVI TERMINATION BY CONTRACTOR <br /> <br />16.1 If. through no fault of Contractor. Owner fails to issue payment pursuant to the provisions of ArtiCle 111 of <br />the Agreement within 30 days of the date payment shall be properly payable. Contractor may. upon seven days' written <br />notice to Owner, terminate the Agreement and recover from Owner payment for all Work executed and for any proven <br />loss sustained upon any materials, equipment. tools. and construction equipment and machinery, including reasonable <br />profit and damages. . <br /> <br />ARTICLE XVII TERMINATION BY OWNER <br /> <br />17.1 If Contractor fails to abide by any provisions of the Agreement. or defaults in its obligation to perform the <br />Work in accordance with the Contract Documents. Owner may. after seven days' written notice to Contractor and without <br />prejudice to any other remedy it may have. make good such deficiencies and may deduct the cost thereof from the payment <br />then or thereafter due Contractor or. at its option, may terminate the Agreement and take possession of the site and of <br />all materials. equipment. tools. and construction equipment and machinery thereon owned by Contractor and may finish <br />the Work by whatever method it may deem expedient. and jf the unpaid balance of the Project Sum exceeds the expense <br />of finishing the Work. such excess shall be paid to Contractor. but jf such expense exceeds such unpaid balance. Contractor <br />shall pay the difference to Owner. <br /> <br />~ <br /> <br />form 4400157 11/88 <br />Page 6 of 6 <br />