Laserfiche WebLink
<br />CONPOl'lENTS <br /> <br />** INFILTRATION REDUCTION PRACTICE CONPLIANCE CHECKLIST ** <br /> <br />======================:========================================================= <br /> <br />SECTION <br /> <br />REQUIRENENTS FOR EACH PRACTICE <br /> <br />CHECK <br /> <br />PPACTICE #1 <br /> <br />=============================================================================== <br /> <br />CONPLY WITH ALL INFILTRATION PRESCRIPTIVES. <br /> <br />606. 1 <br /> <br />----------------------..----.------------.-.--------.--------------.-------.-----.-------------- <br /> <br />Windows <br /> <br />606.1 <br /> <br />Naximum of 0.34 CFN per linear foot of operable sash <br />crack (includes sliding glass doors). <br /> <br />--------------------------.-__________.______M__.__________.__________________.___________..____________ <br /> <br />E)';ter ior ~( <br />Ad.jac~?nt DClors <br /> <br />E,OE,. 1 <br /> <br />Maximum of 0.5 CFM per sq. ft. of door area: solid <br />core, wood panel, insulated or glass doors only. <br /> <br />-------------.------------------------------------....---------.-------------.---..-------------------.-- <br /> <br />E)';t~?t- i,:.t- .Joints <br />~( C:r ac ks <br /> <br />606.1 <br /> <br />To be caulked, gasketed, weather-stripped or other- <br />wise sealed. <br /> <br />PPACTICE #2 <br /> <br />----.-----..------.--------------------.----------------------.--------.---------------------- <br /> <br />COMPLY WITH PRACTICE #1 AND THE FOLLOWING: <br /> <br />606. 1 <br /> <br />--------------------------------------------------------------,----------------------------- <br /> <br />E~/;terior Walls; <br />~( Floors <br /> <br />60E,. 1 <br /> <br />Top plate penetrations sealed. Infiltration barrier <br />installed. Sole plate/floor joint caulked or sealed. <br /> <br />------------------------------------------------------------------------------------- <br /> <br />E~/;t~?r ior W<-all s <br />~( Ceil i.ng~:; <br /> <br />60(;. 1 <br /> <br />Penetyations, .joints and cracks on interior surface <br />caulked, sealed or gasketed. <br /> <br />DuctWork <br /> <br />-----------------------------------------------------------------.------------------------ <br /> <br />Ductwork in unconditioned space must be sealed. <br /> <br />E,Of,. 1 <br /> <br />----------------..-----------------------.-----------------.-----------------..-.---.----------------- <br /> <br />Fir ep 1 ac E)S <br /> <br />E,0E,.1 <br /> <br />Equipped with outside combustion air, doors and flue <br />dampet-s. <br /> <br />E)';haust Fans <br /> <br />-----.----.------------------------------------------------------------------------.--- <br /> <br />60(;. 1 <br /> <br />Equipped with dampeys. Combustion devices see <br />E,OE... 1. A. 2. <br /> <br />------________._______R_______________________________----------------------______________M__ <br /> <br />Combustion <br />Hf-:?at ing <br /> <br />E,OE,. 1 <br /> <br />Combustion space and water heating systems provided <br />with outside combustion ail", except direct vent <br />app 1 i anc E.'S. <br /> <br />-------------.--.--.------.---.---.-..-.-.--.---..-.--..-..--..---------.-------.-......-..----..---------.--------------..--.---------------------- <br /> <br />Water Heaters <br /> <br />** OTHER PRESCRIPTIVE MEASUPES (must be met or exceeded by all residences.) ** <br /> <br />------------.--------------------------.-----------------------------.------------------.---------- <br /> <br />612.1 <br /> <br />Comply with efficiency requirements in Table E,-11. <br />Switch or clearly marked circuit breaker (electric) <br />or cutoff (gas) must be provided. External or built- <br />in heat tyap required. <br /> <br />Swimming Pool ~5 <br />g( Spas; <br /> <br />----------.----...-..--.-..-------.-.-..-----..-.-.---.-.---.----------------.--.--.--.------..------------------.---.----- <br /> <br />612.1 <br /> <br />Spas and heated pools must have coveys (except solar <br />heated). Non-commercial pools must have a pump timer. <br />Gas spa & pool heaters must have a minimum thermal <br />efficiency of 78 percent. <br /> <br />Shower Heads <br /> <br />..-.------.----------------------------------.---..-.-..----------.----------------------------------- <br /> <br />E12.1 <br /> <br />Water flow must be restricted to no more than 3 gal- <br />lons per minute at 80 PSIG. <br /> <br />-..---------.------------------.--.-----.-----------.-----------------.-.-..----.-----.-.----.-- <br /> <br />Air Distribution 610.1 <br />Systems <br /> <br />All ducts, fittings, mechanical equipment and plenum <br />chambers shall be mechanically attached, sealed, ins- <br />ulated and installed in accordance with the criteria <br />of Section E,10. Ducts in unconditioned attics must <br />be insulated to a minimum of R-6. Ail" handlers shall <br />not be installed in attics unless in mechanical <br />c 1 O~5~?t . <br /> <br />HVAC: Cont r 01:; <br /> <br />__________H____...___..___._.__.______.______.________________________________________________ <br /> <br />607.1 <br /> <br />Separate readily accessible manual or automatic <br />thermostat for each system. <br /> <br />Insulation <br /> <br />---------------------------------.-.------------------------------------------------------.--.---..------- <br /> <br />E,04.1 <br />602. 1 <br /> <br />Ceilings minimum R-19. Common Walls - Frame R-11 or <br />CBS R-3 both sides. Common ceiling & floors R-l1. <br />