Laserfiche WebLink
<br />The P.urC:haser agrees to supply the Contractor with the suitable water for original construction, warranty work, cleanup and for filling as required; and <br />will further supply 110 volt electrical outlet for the Contractor's use adequate to operate electrical equil9ment utilized in 'construction (20 amps), and make <br />such outlet 'available to the Contractor for his use when on the job. <br /> <br />UTILITIES <br /> <br />, <br /> <br />EARTH HANDLING AND DRAI~AG'E <br /> <br />All excess excavated material shall be removed from the job site by the Contractor unless specified in the contract documents before start of excavation. <br />The Purchaser agrees to assume all responsibility for excess excavated material left on the site ai his request. No grading except in the immediate pool <br />and deck area is included unless spelled out specifically in the contract documents. <br />When drainage of the Purchaser's property requires filling, cutting or establishement of new grades beyond the construction work built by the Contractor, <br />this shall be considered the Purchaser's responsibility and the Contractor held harmless by him for claims of direct or consequential damages from <br />run-off, standing water or flooding of the Purchaser's or contiguous properties. <br /> <br />CONTRACT DOCUMENTS <br /> <br />Plans, drawings, specifications, warranty and proposal, when submitted by Contractor together with this contract, shall form a part of this contract <br />along with any change orders executed as described on Page 2. In case of conflict between the terms and provisions of other contract documents and <br />this contract, the terms of this contract will prevail. <br /> <br />ORAL AGREEMENTS <br /> <br />All agreements between the Purchaser and the' Contractor must t.~ in writing" d signed by both parties. This contract along with additional documents <br />described above constitutes the entire agreement between the parties, and neither party shall be bound by any statements, representations, or oral <br />expressions by any agent or person purporting to represent or act on behalf of either party. <br /> <br />GENERAL TERMS <br /> <br />This contract shall be binding upon and inure to the benefit of the executors, administrators, assigns and legal successors of the parties hereto. <br />Should any part of this contract be declared invalid for any reason, such decision shall not effect the validity of any remaining portions and shall remain <br />in full force and effect, although the invalid portion has been eliminated. <br />In the event that any of the Purchaser's representations herein as to real property prove to be untrue. and as a result of relying thereon, the Contractor <br />,is put to unusual expense, the Purchaser agrees to pay the Contractor the full amount of any additional expense, in addition to all other payments called <br />for, at the time of final payment. <br />The Contractor expressly denies any responsibility or liability for incidental or consequential damages arising out of or as a result of the use or <br />owmership of this swimming pool. <br /> <br />CONTRACTOR'S RESPONSIBILITIES <br /> <br />The Contractor agrees to supply the materials and labor necessary to perform the work described in the contract documents in a workmanlike manner. <br />The Contractor agrees to work with all other trades on this job regardless of their union or non-union affiliation, The Contractor assumes no responSibility <br />for the refusal of other trades to work with his mechanics and employees. <br />Contractor shall have in force during the entire period of construction liability insurance to the limits of at least $100,000 per person and $300,000 per <br />occurence. <br />Contractor will carry workmen's compensation insurance for the protection of Contractor's employees during the progress of work, Contractor shall <br />not be responsible for injury to Purchaser, his employees or for persons under the Purchaser's direction or other persons at the job site at the Purchaser's <br />express or implied invitation. <br />The Contractor shall regularly remove trash and construction debris from the Purchaser's premises. Upon completion, the site shall be free from <br />construction material, decks and patios shall be broom clean, the pool shall be vacuumed, tile and equipment wiped clean and all equipment placed in <br />operation. <br />Ruts left by equipment will be filled and raked level. No sod replacement, reseeding or replacement of shrubs and landscaping material shall be <br />provided by the Contractor unless specifically spelled out in this contract. <br />The Contractor will not substitute any accessories or equipment specified in the contract documents unless that equipment or accesory is of equal <br />quality or better, and has the same functionalability, useabilty and utility. <br />The Contractor warrants that his work will meet or exceed applicable building Codes. <br />The Contractor agrees to pay the cost of all labor, materials, supplies and any subcontract work used to construct fhe work described in the contract <br />documents and shall hold the Purchaser harmless against liens or other claims from workers and suppliers, unless Purchaser fails to make full payment <br />of contract and change order amounts. <br /> <br />ELECTRICAL <br /> <br />When electrical wiring of pool equipment is included in the contract, the Contractor shall install such work according to local electric codes and Chapter <br />680 of the current National Electric Code. Items such as remote switching, area lighting, convenience outlets, relocation of overhead or underground <br />wires and conduit or increasing the size of the Purchaser's electric service or main panel will be consIdered as extra work and shall be at the Purchaser's <br />expense. <br /> <br />HEATER INSTALLATION <br /> <br />'Heater(s) supplied by the Contractor shall be Installed and plumbed in place by him. When Included in the contract electric heaters shall be wired to <br />power supply, except that upsizing of existing service or panels (when required) shall be at the Purchaser'" expense. <br />Fuel supply and hOOk-Up of tanks, as well as stocking and venting of gas or 011 fired heaters according to applicable codes and laws shall be the <br />responsibility of the Purchaser. <br /> <br />THEFT, VANDALISM AND DAMAGE TO WORK <br /> <br />The Contractor shall not be liable for repairs or damages to any pan of the pool work or equipment resuhing from natural causes of an act of God <br />such as earthquakes, hurricanes, inundation, ground motion or natural settlement. <br />The Contractor shall not be liable for repairs to work nor replacement of equipment from damages caused by neglect, negligence, willful acts, third <br />parties or damage resulting from other construction in the pool area or theft or equipment, components or materials installed or stored on the job site by him, <br /> <br />ATTORNEY FEES AND COLLECTING COSTS <br /> <br />Should services of an attomey be required by the Contractor to collect sums due by virtue of the contract or for the enforcement of any provision of <br />this contract, including but not limited to anticipatory breach of this contract or altematively, arising out of any claim made against the Contractor by the <br />Purchaser, then, in such event, If the Contractor Is successful In the recovery of any such sums or does successfully avoid any of the relief sought by <br />the Purchaser against the Contractor, the Purchaser agrees to pay reasonable attomey's ff;les and all other cost of defense thereof incurred by Contractor. <br />