Laserfiche WebLink
<br />Ehrman Systems <br />Lot #9 <br />Oak Crest Subdivision <br /> <br />VALUATION: $48,060.00 <br />SQ. FT. LIVING: 1 ,194 <br />COST/FT: $35.00 <br />SQ. FT. OTHER: 570 <br />COST/FT: $11.00 <br />VALUATION $48,060.00 <br />DRIVEWAY $20.00 <br />ADDRESS $20.00 <br />FEE SHEET $260.00 <br />SQ. FT. UNDER ROOF 1,764 <br />RADON GAS $17.64 <br /> <br />TRAFFIC IMPACT FEES <br />99% <br />1% <br /> <br />$1,480.00 <br />$1,465.20 <br />$14.80 <br /> <br />PERMIT FEES <br />BUILDING: <br />PLYMBING: <br />ELECTRICAL: <br />MECHANICAL: <br />SUB-TOTAL: <br />CREDIT: <br />TOTAL: <br /> <br />CONNECTION FEES <br />SEWER: <br />WATER: <br />METER: <br />TOTAL: <br /> <br />430.00 <br />60.00 <br />63.75 <br />30.00 <br />$583.75 <br />0.00 <br />$583.75 <br /> <br />1,278.00 <br />350.00 <br />165.00 <br />$1,793.00 <br /> <br />GRAND TOTAL: $3,874.39 <br />