Laserfiche WebLink
<br />.Exterior Lighting Power Allowance 307.50 W ' <br />aaaaaaAaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa <br />******** PASSES ******** <br /> <br />THE LIGHTING SYSTEM CONTROL REQUIREMENTS: <br /> <br />TOTAL EQUIVALENT <br />aaaaaaaaa SPACE aaaaaaaa NO. aaaaaaaaa CONTROLS aaaaaaaa CONTROL POINTS <br />NO. DESCRIPTION AREA TASKS TYPE 1 NO. TYPE 2 NO. INSTLD. REQD. <br />eeeeeeeeeeeeeeeeeeeeeeeeeeeeeeueeeeeeeeeeeeeeleeeeeeeeeeeeeeueeeeeeeeeeeeeeeee <br />28 Accounting 798.0 loOn/Off lOOn/Off 10 2 = 2 <br />28 Accounting 798.0 loOn/Off lOOn/Off 10 2 = 2 <br />eeeeeeeeeeeeeeeeeeeeeeeeeeeeeeoeeeeeeeeeeeeeelieeeeeeeeeeeeeeoeeeeeeeeeeeeeeeee <br />******** PASSES ******** <br /> <br />eeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeee <br />PROJECT TITLE PERRIER WAREHOUSE EXPANSION <br />BUILDING TYPE Factory - Industrial <br />BUILDING LOCATION Zephyr hills <br />BUILDING AREA(ft2): 1736 <br />aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa <br />HVAC SYSTEMS PERFORMANCE: <br />eeeeeeeeeeeeeeleeeeeeeeeleeeeeeleeeeeeleeeeeeeeleeeeeeeeleeeeeeeeeleeeeeeeeee <br />Cooling SystemO Measure oMinim.oMinim.o System 0 System 0 Result 0 Result <br />Type 0#1 #20 #1 0 #2 0 Eff.#l 0 Eff.#2 0 for #1 0 for #2 <br />aaaaaaaaaaaaaaeaaaaaaaaaeaaaaaaeaaaaaaeaaaaaaaaeaaaaaaaaeaaaaaaaaaeaaaaaaaaaa <br />Split Sys. oSEER 0 10.000 0.000 10.90 6.90 PASSES 0 <br />Split Sys. OSEER .0 10.000 0.000 10.90 6.90 PASSES 0 <br />eeeeeeeeeeeeeeAeeeeeeeeeAeeeeeelieeeeeeAeeeeeeeeUeeeeeeeeAeeeeeeeeelieeeeeeeeee <br />Heating SystemO Measure 0 Minimum Req.o Efficiency Result <br />aaaaaaaaaaaaaaeaaaaaaaaaeaaaaaaaaaaaaaeaaaaaaaaaaaaaaaaaeaaaaaaaaaaaaaaaaaaaa <br />Split Sys. HSPF 6.80 &.90 PASSES <br />Split Sys. HSPF 6.80 6.90 PASSES <br />aaaaaaaaaaaaaaeaaaaaaaaaeaaaaaaaaaaaaaeaaaaaaaaaaaaaaaaaeaaaaaaaaaaaaaaaaaaaa <br />******** PASSES ******** <br /> <br />AIR DISTRIBUTION SYSTEM INSULATION LEVELS: <br />aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa <br />Zone # Duct Location Minimum R-Value Design R-Value Result <br />eeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeee <br />1. Conditioned Space 0.00 12.00 N/A <br />2. ventilated 6.00 19.00 PASSES <br />eeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeee <br />******** PASSES ******** <br /> <br />o <br /> <br />eeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeee <br />PROJECT TITLE PERRIER WAREHOUSE EXPANSION <br />BUILDING TYPE Factory - Industrial <br />BUILDING LOCATION: Zephyr hills <br />BUILDINGAREA(ft2): 1736 <br />aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa <br />WATER HEATING SYSTEMS PRESCRIPTIVE CRITERIA <br />eeeeeeeeeeeeeeeeeleeeeeeeleeeeeeeeeeleeeeeeeeeeleeeeeeeeeeleeeeeeeeeeleeeeeee <br />System oMeasureo Minimum 0 Maximum 0 Design Design oResult <br />Type 0 0 EF / Et 0 SL 0 EF / Et 0 SL 0 <br />eeeeeeeeeeeeeeeeeAeeeeeeeAeeeeeeeeeeAeeeeeeeeeeAeeeeeeeeeeAeeeeeeeeeeAeeeeeee <br /> <br />. <br /> <br />. <br /> <br />, <br />