Laserfiche WebLink
<br />Bertuca Home <br /> <br />.' <br /> <br />Vll.) Net Uplift <br /> <br />Roof Deadloads: <br /> <br />Element Description . Weight (psf) <br />Covering Fiberglass Shingles 2.0 <br />Sheathing 1/2" CDX 1.6 <br />Framing Wood Trusses@ 24" O,c. 6.0 <br />Ceiling 1/2" Gypsum 2.2 <br /> <br />(SBC APpendix A) <br /> <br />Total Roof Load = <br /> <br />11.8 <br /> <br />psf <br /> <br />Height (ft) IJplift pressure(pst) Roof Load (psf) Net Uplift (psf) <br />0-15 -21.0 11.8 -9.2 <br />15-20 -23.0 11.8 -11.2 <br />20-40 -28.0 11.8 -16,2 <br />40-60 -31.0 11.8 -19.2 <br /> <br />VIII.) Hold-down at truss connection: <br /> <br />Maximum truss length = <br /> <br />46.7 ft <br /> <br />(Assumes building width + 2 x overhang) <br /> <br />Truss spacing (ft) = <br /> <br />Height (ft) Contrib. area (st) Net Uplift (pst) **Uplift per brg. (lbs)1 <br />0-15 93.3 -9.2 -429.3 1 <br />15-20 93.3 -11.2 -522.6 <br />20-40 93.3 -16.2 -755.9 <br />40-60 93.3 -19.2 -895.9 <br /> <br />2 <br /> <br />ft <br /> <br />Page 5 <br /> <br /> <br />** Specify hold-down accordingly, FS 'built in' to Mfr's tables. <br />