My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
95-4735
Zephyrhills
>
Building Department
>
Permits
>
1995
>
95-4735
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2009 2:41:29 PM
Creation date
6/20/2006 11:18:17 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
95-4735
Building Department - Name
MILLER,CHRIS
Address
5251 19TH ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />ST ANDARD FORM OF AGREEMENT <br />BETWEEN CONTRACTOR AND OWNER <br />~:.::~=.,:::;~~ . 1/ ODd ..:.Z:;;t -zt:,~ ~ i> - f t, :':t: ~ <br /> <br />hereinafter called the Contractor, ant1 C ~ n ~ /l1 t'1. e r- erelnaf:er called the <br />Owner, Witnesseth, that the Contractor and the Owner for the considerations named agree as follows: <br /> <br />ARTICLE 1. SCOPE OF THE WORK <br /> <br />8e/ot-L) <br />Thtl Contractor shall furnish all of the materials and perfonn all of the work shown on the Drawings and described ItF-li.c Speaft"..th..,1S <br /> <br />entitled <br />prepared by . acting as and In thp.se <br />Contract Documents entitled the Architect, and shall do everything required by this agreement, the general conditions of the Contract, the <br />Specifications and the Drawings. <br /> <br />ARTICLE!. TIME OF COMPLETION <br /> <br />The work to be perfonned under this Contract shall be commence <br />substantially completed <br /> <br /> <br />f..f-- <br /> <br />d shall be <br /> <br />ARTICLE 3. THE CONTRACI SUM <br /> <br />The Owner shall pay tb!t Contr'!9or ~e perfonnance of the Contract, subject to additions and deductions provided therein, in current <br /> <br />funds as follows: ...2.. .:2- ..:> , ' <br />. (State hen the lump IUID amount, unit price., or both, .. de.lred) <br /> <br />~M.( ~/~ ~tlljt.-- ~f(..:.a( /() rJ(t:;/ ~ c.u.~ <br />. If If _ ;jfJLl.~; _..L- . ~d .... /. <br />~ fJ ~.-. ~ {b.,/U ~/ k tv, '4d'(;J f-- <br /> <br />Authorized Change Orders will be submitted by the Contractor for all work nol specifically included in this Contract. <br />ARTICLE 4, PROGRESS PAYMENTS <br /> <br />~ 5,25/ <br /> <br />d~ <br /> <br />I~.E yT; <br /> <br />;;t- t /;/t , <br /> <br />~~ <br /> <br />(InIert he.. any provlllon made for the amount retained after the work ..ache. a certain .tale of completion.) <br /> <br />ARTICLE 5. ACCEPTANCE AND FINAL PAYMENT <br /> <br />Final payment shall be dUA ~ <br />and the Contract fully perfonned. . <br /> <br />ARTICLE 6. THE CONTRACT DOCUMENTS <br /> <br />The General Conditions of the Contrac!J the Specifications and ~e Drawings, together with this Agreement, form the Contract, and they <br />&rlnfe as fully a part of the Contract as 11: hereto attached or herem repeated. The following II an itemization of other essential pertinent <br />ormation: . <br /> <br />days ~ter substantial completion of the work provided the work be then fully completed <br /> <br />~~~~/Lj <br />Owner . . <br />~ <br /> <br />f21t1 ~d <br /> <br /> <br />Contractor <br /> <br />SEMINOLE FORM .,. <br />
The URL can be used to link to this page
Your browser does not support the video tag.