Laserfiche WebLink
<br />Work Instructions <br /> <br />1. Install 18-1 Radio Control Module, Generator <br />Interface Module, Meter Can, UPS, prr Cabinet <br />at locations indicated on sheet 3. <br /> <br />2. Install CT's and PT Fuses in the cubicle <br />indicated on sheet 3. <br />3. Install cables and make terminations shown on <br />sheet 4. <br />4. Install sIgns. <br /> <br />Florida Power Corp. Supplied Materials <br /> <br />1. Transformer rated meter can for 3-element <br />meter. <br />2. 3- Element Transformer Raled meter with <br />registers set for CT=200:5 PT=276:120 and <br />display Multiplier=92. <br />3. 100' Meter multi-conductor cable, <br /># 12 Cu, 7 cond., with outer cover, 600Y THW, <br />4. 18-1 Radio Control Module <br />5. Generator Interface Module. <br />6. UPS <br />7. PT Cabinet wi PTs (276:120) <br />8. CT's (200:5) <br />9. prr Tap {t'uses and Holders <br />10. Remote Alarm Module <br />11. Outside Radio Switch Antenna <br />12. Coaxial Cable for Antenna <br />13. 1000' 7 conductor #18 Control Cable <br /> <br />Note: It is the Contractor's responsibility to coordinate <br />the installation of the CT's and PT taps with the site <br />operations slaff. <br /> <br />Contractor Supplted Materials <br /> <br />1. All Conduit and Wire Termination supplies. <br />2. All other supplies required for installation, <br />3. Enclosure for UPS. <br />4. Signs for FPC Contact and FPC Equipment <br />location. <br /> <br />City of Zephyrhflls <br />Waste Water Treatment Plant <br />Zephyrhllls, FL <br /> <br /> <br />Clearwater <br />Distribution <br />Engfneering <br /> <br />_Florida <br />Power <br />~T1D'. <br /> <br />Slandb Generation <br />