Laserfiche WebLink
<br />La\-. \()~\ <br /> <br />~+~c:$J~' <br /> <br />SN: 6096 <br /> <br />Department of Community Affairs <br />rLORIDA E~ERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTI0N <br />FbRM ~00A-93 Residential Component Prescriptive Method A CENTRAL <br />PROJECT NAME: DRIFTWOJD QUAD :BUILDER: GENERAL HOME DEVELOPMENT CORP. <br />f~ND ADPRfi~::;:J ,CJTT~Nl,.JOOD PL_A: PERt-1:T:~ING 1'/1// i CLI~~TE:, v(' I I . I , <br />31?"J(rr2LdZi~ ZEPH rRHILL5, FL -335, OFFIcE. ...Lf{Ji4 I ZOl'k. 4, ._' 5, _, 6, __' <br />mmER: ~\ ~(' De-.re\l:lpll"'~""+ C5Jrf': PERt-HT r . Y<f1,Y;J : JURISDICTION NO. bl/ ~:::~ Z:> <br /> <br />L. New construction or addition 1. New Construction <br />,. Single family detached or Multifamily attached 2. Multi-Family <br />3. If Multifamily-No. of units 3. 4 <br />4. If Multifamily, is this a worst case (yes/no) 4. No <br />~. Conditioned floor area (sq.ft.) 5. 1195.00 <br />S. predominant eave overhang (ft.) 6. 2.30 <br />7. Porch overhang length (ft.) 7. 0.00 <br />3. Glass area and type: Single Pane <br />a. Clear Glass 8a.349.0sqft <br />b. Tint, film or solar screen 8b. O.Osqft <br />). Floor type and insulation: <br />a. Slab on grade (R-value, perimeter) <br />10.Net Wall type area and insulation: <br />a. E.>:terior: 1. Concret_e (Insulation R-value) 10a--l R= 4.20, 666.20sqft_ <br />d. I::xterior: 2. [.Jood f1-am(~ (Insulation r;Z-.val.ue) 10,,,,'-2 pc:::11.00, 40.30sqft_ <br />11.Ceiling type area and insulation: <br />B. Under attic (Insulation R-value) <br />a. Under attic (Insulation R-value) <br />12.Air distribution systems <br />B. Ducts (Insulation + Location) <br />13.Cooling system <br /> <br />Double Pane <br />o .00:sqft <br />O.OOsqft <br /> <br />9a.R= 0.00 , 108.00 ft <br /> <br />lla .R:=22 .00 <br />l1a.R=30.00 <br /> <br />98.00sqft_._ <br />1200.00sqft_.__ <br /> <br />15.Hot <br /> <br />IrJate1- <br /> <br />system: <br /> <br />12a. R= 6.00 uncond <br />13. Type: Central A/C <br />EI::R: 10.00 <br />14. Type: Heat Pump <br />HSPF: 7.00 <br />15. Type: Electric <br />EF: 0.90 <br /> <br />14.Heating System: <br /> <br />16.Hot Water Credits: (HR-Heat Recovery, <br />DHP-Dedicated Heat Pump) <br />17.Infiltration practice: 1, 2 or 3 <br />18.HVAC Credits (CF-Ceiling Fan, CV-Cross vent, <br />HF-Whole hOLse fan, RB-Attic radiant <br />barrier, MZ-Multizone) <br />19.EPI (must not exceed 100 points) <br />a. Total As_Built point:3 <br />b. Total E;ase points <br /> <br />16. <br /> <br />17. <br />18. <br /> <br />2 <br /> <br />19. <br />19a. <br />19b. <br /> <br />91.50 <br />21079.52 <br />23037.09 <br /> <br />-----------------------_._.._~----~---------------------..-----------.--------- -,--~------------ <br /> <br />-----------------------..-----------------------------------------------------'------ <br /> <br />Pf\EPARED BY: <br />DATE: <br /> <br />,;.,-, <br />\--._~t:'-~~-t~~ <br />":r- Co -95 <br /> <br />Review of the plans and specifications <br />covered by this calculation indicates <br />compliance with the Florida Energy <br />Code. Before construction is completed <br />this building will be inspected for <br />compliance in accordance with Section <br />553.908 F.S. <br /> <br />I Hereby certify that the plans and <br />specifications covered by this calcu- <br />lation are in compliance with the <br />Florida Energy Code. <br /> <br />I hereby certify that this building is <br />in compliance with the Florida Energy <br />Code. <br /> <br />Ol.JNER~E~~_~~~'L.~ <br />D {., T E :.___=~~~__________~_~..3.::_~'i5 <br /> <br />BUILDING OFFIC~'4d~ <br />DATE: __ 5 -;:2. - <br /> <br />.~il_ <br />