Laserfiche WebLink
<br /> CUM TOTAL <br /> EXTERIOR (CONTINUED) <br />SPEC # WORK AND DESCRIPTION LOCATION <br />32 WINDOWS - GENERAL SPECIFICATIONS <br /> Egress windows (one per bedroom <br /> pr plan). Remove existing windows. <br /> Install new single hung egress <br /> windows with screens (ALCAN) or <br /> approved equal as follows: <br /> C23 (37" x 38 1/4j (LH) BEDROOM NO.2 <br /> C33 (53 1/8" x 38 1/4j BEDROOM NO.1 (RH) <br /> BEDROOM NO.3 (LH) <br /> Provide per plan new windows <br /> of sizes indicated. Windows to <br /> be aluminum single hung <br /> complete with screens. Match <br /> existing window finishes. SEE PLAN <br />36 EXTERIOR DOORS <br /> Contractor to install new front doors <br /> and frame. Owner to select for <br /> contractor purchase. (Allowance for <br /> purchase and installation) FRONT ENTRANCE At <br />42 EXTERIOR SIDING - STUCCO <br /> Stucco finish over block to match <br /> existing adjacent stucco. Required at <br /> all new block walls and wall openings <br /> that are blocked up. NEW BLOCK WALLS <br />54 WALL INSULATION <br /> In all new exterior walls, install <br /> insulation as required to <br /> achieve R.11. BATH NO.1 <br /> BATH NO.2 <br /> BEDROOM NO.1 <br /> . <br /> Install wall insulation between <br /> furring at exterior masonry walls <br /> per para. b. ALL NEW EXTERIOR <br /> MASONRY WALLS <br />55 CEILING INSULATION <br /> Check existing ceiling insulation. <br /> Add insulation as required to <br /> achieve R-19. ENTIRE HOUSE <br /> <br />PAGE TOTAL <br /> <br />CUM TOTAL <br /> <br />Lenora Stokes - Unit 2 <br /> <br />Revised March 7,1995 <br />