Laserfiche WebLink
<br />CUM TOTAL <br /> <br /> INTERIOR <br />SPEC 1# WORK AND DESCRIPTION LOCA TION <br />1 DEMOLITION/REMOVAL WORK <br /> Remove existing indicated interior <br /> materials and finishes and dispose <br /> of off premises. ENTIRE UNIT <br /> (SEE PLAN) <br /> Remove indicated partitions as required <br /> for new plan. ENTIRE UNIT <br /> (SEE PLAN) <br /> Remove all existing plumbing fixtures, <br /> (rough)(finished) plumbing, rough and <br /> finished electrical work that is not <br /> indicated in the final plan. ENTIRE UNIT <br /> (SEE PLAN) <br />14 FLOOR REPAIR <br /> After all removals, repair floor and <br /> install under1ayment suitable for <br /> installation of finished flooring. ENTIRE UNIT <br />18/19 ALL FLOORING COVERING/CARPET <br /> Install new carpet over padding. (Included <br /> are all closets opening into rooms to be <br /> carpeted). LIVING ROOM <br /> BEDROOM NO.1 <br /> BEDROOM NO.1 <br /> W.1. CLOSET <br /> BEDROOM NO.2 <br /> BEDROOM NO.3 <br />18/20 ALL FLOOR COVERING/RESILIENT <br /> FLOOR COVERING - (VINYL TILE) <br /> Over proper under1ayment, install <br /> a new 12 x 12vinyl tile floor. KITCHEN <br /> HALL <br /> BATH NO.1 <br /> BATH NO.2 <br /> BATH NO.3 <br /> WID CLOSET <br /> FOYER <br /> <br />PAGE TOTAL <br /> <br />CUM TOTAL <br /> <br />Lenora Stokes - Unit 2 <br /> <br />Revised March 7, 1995 <br />