Laserfiche WebLink
<br /> CUM TOTAL <br /> INTERIOR (CONTINUED) <br />SPEC # WORK AND DESCRIPTION LOCATION <br />62 CERAMIC TILE (THIN SET) <br /> Remove existing wall finish and backup <br /> to studs at bathtub surround. Install <br /> new wonderboard backing and new <br /> ceramic tile surround 5'.0" high (above <br /> top) at tub/shower and full height at <br /> shower. BATH NO.1 <br /> BATH NO.2 <br /> BATH NO.3 <br />63 FIXTURE SET <br /> Furnish and install a new fixture set. BATH NO.1 <br /> BATH NO.2 <br /> BATH NO.3 <br />64 INTERIOR CEILING FINISH <br /> Install new gypsum wallboard finish <br /> on ceiling. BATH NO.2 <br /> BATH NO.3 <br /> After removal of existing ceiling tile, <br /> install a new drywall ceiling. BEDROOM NO.1 <br />65 INTERIOR CEIUNG FINISH _ <br /> PLASTER/DRYWALL REPAIR <br /> Where existing interior partitions <br /> have been removed, repair all <br /> partition/ceiling intersections <br /> by patching with gypsum <br /> wallboard. Finish with "popcorn" <br /> texture finish. LOCATIONS <br /> PER PLAN <br />70 ATTIC ACCESS <br /> Install a ceiling access panel to <br /> minimum clearing opening of <br /> 22" x 36". Provide cover and <br /> trim opening. HALL <br /> (SEE PLAN) <br /> <br />PAGE TOTAL <br />CUM TOTAL <br /> <br />Lenora Stokes. Unit 2 <br /> <br />Revised March 7.1995 <br />