Laserfiche WebLink
<br /> CUM TOTAL <br /> INTERIOR <br />SPEC ## WORK AND DESCRIPTION LOCATION <br />1 DEMOUTIONlREMOV AL WORK <br /> Remove existing indicated interior <br /> materials and finishes and dispose <br /> of off premises. ENTIRE UNIT <br /> (SEE PLAN) <br /> Remove indicated partitions as required <br /> for new plan. ENTIRE UNIT <br /> (SEE PLAN) <br /> Remove all existing plumbing fixtures, <br /> rough and finished plumbing, rough and <br /> finished electrical work that is not <br /> indicated in the final plan. ENTIRE UNIT <br />14 FLOOR REPAIR <br /> After all removals, repair floor and <br /> install undertayment suitable for <br /> installation of finished f1oortng. ENTIRE UNIT <br />18/19 ALL FLOORING COVERING/CARPET <br /> Install new carpet over padding. (Included <br /> are all closets opening into rooms to be <br /> carpeted). LIVING ROOM (PART) <br /> DINING AREA (PART) <br /> BEDROOM NO.1 <br /> BEDROOM NO.2 <br /> BEDROOM NO.3 <br /> BEDROOM NO. .. <br /> HALL NO.1 <br />18/20 ALL FLOOR COVERING/RESILIENT <br /> FLOOR COVERING. (VINYL TILE) <br /> Over proper undertayment, install <br /> a new 12 x 12vinyl tile floor. LIVING ROOM (PART) <br /> DINING AREA (PART) <br /> KITCHEN <br /> HALL NO.2 <br /> BATH NO.1 <br /> BATH NO.2 <br /> BATH NO.3 <br /> WID CLOSET <br />24 BASE AND SHOE MOULDING <br /> Install new wood base and shoe <br /> moulding on all new walls In spaces <br /> where vinyl tile Is to be Installed. <br /> (See 18/20). SEE 18/20 <br /> <br />PAGE TOTAL <br />CUM TOTAL <br /> <br />Lenora Stokes <br /> <br />Revised March 7,1995 <br />