Laserfiche WebLink
<br /> CUM TOTAL <br /> INTERIOR (CONTINUED) <br />SPEC t# WORK AND DESCRIPTION lOCATION <br />59 INTERIOR WALL FINISH - <br /> DRYWALL OVER FURRING STRIPS <br /> At new exterior block wall(s), Install new <br /> drywall finish over wood funing. <br /> (Insulate per exterior spec. 54b.) NEW BLOCK WALLS <br /> (SEE PLAN) <br />62 CERAMIC TilE (THIN SET) <br /> Install new wonderboard backing and new <br /> ceramic tile surround 5'.0- high (above <br /> top) at tub/shower and full height at <br /> HC shower. BATH NO.1 <br /> BATH NO.2 <br /> BATH NO.3 <br />63 FIXTURE SET <br /> Fumish and install a new fIXture set. BATH NO.1 <br /> BATH NO.2 <br /> BATH NO.3 <br />65 INTERIOR CEILING FINISH - <br /> PLASTER/DRYWALL REPAIR <br /> Where existing Interior partitions <br /> have been removed, repair all <br /> partition/ceiling Intersections <br /> by patching with gypsum <br /> wallboard. Finish with .popcom. <br /> texture finish. LOCATIONS <br /> PER PLAN <br /> <br />66 INTERIOR CEiliNG FINISH - DRYWAll <br />Remove existing tile ceilings. Install new <br />gypsum drywall ceilings where tile is <br />removed. Include all required joists, blocking <br />and funing as required for new ceilings. All TilE CEILING <br />AREAS <br /> <br />70 <br /> <br />ATTIC ACCESS <br />Install two ceiling access panels <br />to minimum clearing opening of <br />22- x 36. to access both above <br />ceiling spaces. Provide cover and <br />trim opening. <br /> <br />SEE PLAN <br /> <br />" PAGE TOTAL <br />CUM TOTAL, <br /> <br />Lenora Stokes <br /> <br />Revised March 7,1995 <br />