Laserfiche WebLink
<br />INTERIOR (CONTINUED) <br /> <br />SPEC # <br /> <br />WORK AND DESCRIPTION <br /> <br />CUM TOTAL <br /> <br />LOCATION <br /> <br />84/85 PLUMBING - GENERAL SPECIFICATIONS, ' <br />PLUMBING FIXTURES (CONTINUED) <br />Install a new water closet. (H.C. type in <br />Bath No.1). BATH NO.1 <br />BATH NO.2 <br />BATH NO.3 <br /> <br />Install all new water supply. waste and <br />vent piping as required to code to <br />accommodate all existing and <br />proposed new plumbing. <br /> <br />ENTIRE UNIT <br /> <br />Install water supply. waste and vent plumbing <br />lines to code at new clothes washer location. <br />(Washer by Owner) WID CLOSET <br /> <br />Install a new fiberglass H.C. shower unit <br />seat and grab bars. Dimensions per plan. <br /> <br />Connect new vanity lavatory with new <br />fittings. trap and faucets. <br /> <br />Install an insulation blanket on the existing <br />water heater(s). <br /> <br />Re-Iocate existing water heater and re-plumb <br />to code. Make all necessary new <br />connections to all plumbing lines. <br />See location per plan. (Wood shelf for <br />WIH required). <br /> <br />Provide water supply waste and vent <br />rough plumbing lines only for future <br />dishwasher. Cap. Connect to house <br />sewer. <br /> <br />86 <br /> <br />MAJOR APPLIANCES <br />Fumish and Install a' new 30. electric <br />range/oven. <br /> <br />Furnish and Install a new 18 cu. ft. <br />refrigerator/freezer. <br /> <br />Lenora Stokes <br /> <br />BATH NO.1 <br /> <br />BATH NO.1 <br />BATH NO.2 <br />BATH NO.3 <br /> <br />WID CLOSET <br /> <br />WID CLOSET <br /> <br />KITCHEN <br /> <br />KITCHEN <br /> <br />KITCHEN <br /> <br />PAGE TOTAL <br /> <br />CUM TOTAL <br /> <br />Revised March 7,1995 <br /> <br />ALL' <br />$ <br />-, <br /> <br />ALe <br />) <br />