Laserfiche WebLink
<br />( <br /> <br />ELEVATION CERTIFICATE <br /> <br />FEDERAL EMERGENCY MANAGEMENT AGENCY <br />NATIONAL FLOOD INSURANCE PROGRAM <br />ATTENTION: Use of this certificate does not provide a waiver of the flood insurance purchase requirement. This form is used only to <br />provide elevation information necessary to ensure compliance with applicable community floodplain management ordinances, to <br />determine the proper insurance premium rate, and/or to support a request for a Letter of Map Amendment or Revision (LO~A or LOMR). <br />Instructions for completing this form can be found on the following pages, <br /> <br />I <br />I <br />. <br /> <br />O.M.B..Nr;: 3067-0077 <br />EJepi'esMily3'. '993 <br /> <br /> <br />SECTION A PROPERTY INFORMATION <br /> <br />FOR INSURANCE COMPANY USE <br />POLICY NUMBER <br /> <br />COMPANY NAIC NUMBER <br /> <br />OTHER DESCRIPTION (Lot and Block Numbers. etc.) <br />/t -d.-h -;;2:/- 0/<20- CO tJ{)CJ- C) h ;2..0 <br /> <br />CI~y+L~ <br /> <br />'" )STATE <br />'T~ <br />SECTION B FLOOD INSURANCE RATE MAP (FIRM) INFORMATION <br /> <br />ZIP CODE <br />3'3S,......'I1 <br /> <br />Provide the following from the proper FIRM (See Instructions): <br /> <br />1. COMMUNITY NUMBER 2. PANEL NUMBER 3. SUFFIX 4. DATE OF FIRM INDEX 5. FIRM ZONE 6. BASE FLOOD ELEVATION <br /> A-E (in AO Zones. use depth) <br />) ;) tJ .?-3 S- O CJ 0 ...5- C- J.;)..- /7 - Y r f-~-/-r <br /> <br />7. Indicate the elevation datum system used on the FIRM for Base Flood Elevations (BFE): 0 NGVD '29 0 Other (describe on back) <br />8. For Zones A or V, where no BFE is provided on the FIRM, and the community has established a BFE for this building site, Indicate <br />the community's BFE: I I I /215T.U feet NGVD (or other FIRM datum-see Section B, Item 7). <br /> <br />SECTION C BUILDING ELEVATION INFORMATION <br /> <br />1. Using the Elevation Certificate Instructions, indicate the diagram number from the diagrams found on Pages 5 and 6 that best <br />describes the subject building's reference level ----1- . <br />2(a). FIRM Zones A 1-A30, AE, AH, and A (with BFE). The top of the reference level floor from the selected diagram is at an elevation <br />of I I I ~ 1$'1. ~ feet NGVD (or other FIRM datum-see Section B, Item 7). <br />(b). FIRM Zones V1-V30, VE, and V (with BFE). The bottom of the lowest horizontal structural member of the reference level from <br />the selected diagram, is at an elevation of I I I I I I.U feet NGVD (or other FIRM datum-see Section B, item 7). <br />(c). FIRM Zone A (without BFE). The floor used as the reference level from the selected diagram is W .LJ feet above 0 or <br />below 0 (check one) the highest grade adjacent to the building. <br /> <br />(d). FIRM Zone AO. The floor used as the reference level from the selected diagram is W.U feet above 0 or below 0 (check <br />one) the highest grade adjacent to the building. If no flood depth number is available, is the building's lowest floor (reference <br />level) elevated In accordance with the community's floodplain management ordinance? 0 Yes 0 No 0 Unknown <br />3. Indicate the elevation datum system used in determining the above reference level elevations: ~GVD '29 0 Other (describe <br />under Comments on Page 2). (NOTE: If the elevation datum used in measuring the elevations is different than that used on <br />the FIRM (see Section B, /tem 7J. then convert the elevations to the datum system used on the FIRM and show the conversion <br />equation under Comments on Page 2.) <br />4. Elevation reference mark used appears on FIRM: 0 Yes ~-No (See Instructions on Page 4) <br /> <br />5. The reference level elevation is based on: ca-- actual construction 0 construction drawings <br />(NOTE: Use of construction drawings is only valid if the building does not yet have the reference level floor in place, in which <br />case this certificate will only be valid for the building during the course of construction. A post-construction Elevation Certificate <br />wilt be required once construction is complete.} <br /> <br />6. The elevation of the lowest grade immediately adjacent to the building is: I I I '8 J5 1.1f1 feet NGVD (or other FIRM datum-see <br />Section B, Item 7). <br /> <br />SECTION D COMMUNITY INFORMATION <br /> <br />1. If the community official responsible for verifying building elevations specifies that the reference level indicated in Section C. Item 1 <br />is not the "lowest floor" as defined in the community's floodplain management ordinance, the elevation of the building's "lowest <br />floor" as defined by the ordinance Is: I I I I I I.U' feet NGVD (or other FIRM datum-see Section B, Item 7). <br />2. Date of the start of construction or substantial Improvement <br /> <br />FEMA Form 81-31,MAY 90 <br /> <br />REPLACES All PREVIOUS EDITIONS <br /> <br />SEE REVERSE SIDE FOR CONTINUATION <br />