Laserfiche WebLink
<br />COMPONENTS <br /> <br />I ** tNFILTRATION REDUCTION PRACTICE COMPLIANCE CHECKLIST ** <br /> <br />~======~==~==~===========================================~=============~======== <br /> <br />SECTION <br /> <br />REQUIREMENTS FOR EACH PRACtICE <br /> <br />CHECk <br /> <br />----------------------------~-------------------------------------------------- <br />---------~------_._~--------------------------------~------------~---------------- <br /> <br />PRACTICE #1 <br /> <br />606.1 <br /> <br />COMPLY WITH ALL INFILTRATION PRESCRIPTIVES. <br /> <br />...------------------------------------------------------------------------------------ <br /> <br />ltJindows <br /> <br />606. 1 <br /> <br />Maximum of 0.34 CFM per linear foot of operable sash <br />crack (includes sliding glass doors). <br /> <br />E~d;et- ior 8~ <br />r'\djacent Doot..s <br /> <br />---------------------..-.----...---_________.._M___.________._________.___......._______._________________________ <br /> <br />606.1 <br /> <br />Maximum of 0.5 CFM per sq. ft. of door area: solid <br />core, wood panel, insulated or glass doors only. <br /> <br />E~;tet-iot- .Joint;s <br />8~ Cracks <br /> <br />~----------------_.M.._N.____~_____W__.____._______._.----__M____.____w_______________________ <br /> <br />To be caulked, gasketed, weather-stripped or other- <br />wise sealed. <br /> <br />606. 1 <br /> <br />PRACTICE #2 <br /> <br />..---------------..--------.-...-.--.------.-----.--.-----.-----------.----.----------------------- <br /> <br />COMPLY WITH PRACTICE #1 AND THE FOLLOWING: <br /> <br />606.1 <br /> <br />-----M._______N__.___.__W______M.________________.._.._w..___._~n_N._"_.._____.________.___.___.._._.___.___.__._____M_________ <br /> <br />E~,; ter ior Wa 11 s <br />8~ Floor's <br /> <br />606.1 <br /> <br />Top plate penetrations sealed. Infiltration barrier <br />installed. Sole plate/floor joint caulked or sealed. <br /> <br />E~;terior llJalls <br />8! Ceilings <br /> <br />---------------------------------------------------.------------------------------------- <br /> <br />606.1 <br /> <br />Penetrations, joints and cracks on interior surface <br />caulked, sealed or gasketed. <br /> <br />I:II.l I.: tWOt" k <br /> <br />----------------------..------.---..-..-..-..----__________M_~________.._....._______.____._..___________________ <br /> <br />Ductwork in unconditioned space must be sealed. <br /> <br />606.1 <br /> <br />------------.--..---..----..-.--.---.--..--.-------.-..------------.-------------..--------.-.-------------------- <br /> <br />F.it-ep 1 aces <br /> <br />606. 1 <br /> <br />Equipped with outsIde combustion air, doors and flue <br />damp~?n,;. <br /> <br />E~,;haust Fans <br /> <br />---------------------------------------------------.---..-..------.---.------------------------ <br /> <br />Equipped with dampers. Combustion devices see <br />606. 1 . A. 2. <br /> <br />606. 1 <br /> <br />ComblJst ion <br />Heating <br /> <br />----------------._-------_..._---_._--_.._~----_._--------------_._-._~~---_.._.._.._------------_._-_.._--------------..---- <br /> <br />606.1 <br /> <br />Combustion space and water heating systems provided <br />with outside combustion air, except direct vent <br />appli.ances. <br /> <br />----.-----------.--.-----.-..------.-.--.-------.-------..---.-.---------..----------._._._____.__NM_____________________ <br /> <br />~Jater He..at;et-s <br /> <br />~* OTHER PRESCRIPTIVE MEASURES (must be met or exceeded by all residences.) ** <br /> <br />---.------.--.-----.....-..-.--..--.---.----.-..----...-------.--n______________w..n_...________N_..____________._N__.______________ <br /> <br />r; 1.:;~. 1. <br /> <br />Comply with efficiency requirements in Table 6-11. <br />Switch or clearly marked circuit breaker (electric) <br />or cutoff (gas) must be provided. External or built- <br />in heat trap required. <br /> <br />Swimming PCII:,),S <br />8, Spas <br /> <br />...---------.--.----w.---"....-____._._______._______w----.-.--..-.--M-__._____..______.~.___.._w_____.__._______ <br /> <br />61.2." <br /> <br />Spas and heated pools must have covers (except solar <br />heated). Non-commercial pools must have a pump timer. <br />Gas spa & pool heaters must have a minimum thermal <br />efficiency of 78 percent. <br /> <br />Showet- Heads <br /> <br />---.----------------------.----------.-.---..---------.---_______w_M_______M_.__.______________________ <br /> <br />6"2.1 <br /> <br />Water flow must be restricted to no more than 3 gal- <br />lons per minute at 80 PSIG. <br /> <br />_._-------------_._--._._---_..__.~-----------_._-------.------------------.------------------------- <br /> <br />Air Distribution 610." <br />f:iys tems <br /> <br />All ducts, fittings, mechanical equipment and plenum <br />chambers shall be mechanically attached, sealed, ins- <br />ulated and installed in accordance with the criteria <br />of Section 610. Ducts in unconditioned attics must <br />be insulated to a minimum of R-6. Air handlers shall <br />not be installed in attics unless in mechanical <br />closet. <br /> <br />HVAC Cont;rols <br /> <br />_.___._w___________._______._________..____..__.___.__------.h___~____....__._..N_._...____._._______.____________________ <br /> <br />607.1. <br /> <br />Insulation <br /> <br />-----------------------------------------._______.w________________.____.__________________ <br /> <br />Separate readily accessible manual or automatic <br />thermostat for each system. <br /> <br />604. 1 <br />602.1 <br /> <br />Ceilings minimum R-19. Common Walls - Frame R-lt or <br />CBS R-3 both sides. Common ceiling & floors R-1t. <br /> <br />,. <br />