Laserfiche WebLink
<br />....<~.!~,........, <br /> <br />Lor fJ/ <br /> <br />ELEVATION CERTIFICATE <br /> <br />FEDERAL EMERGENCY MANAGEMENT AGENCY <br />NATIONAL FLOOD INSURANCE PROGRAM <br />ATIENTlON: Use of this certificate does not provide a waiver of the flood Insurance purchase requirement. ' This form is used only to <br />provide elevation Information necessary to ensure compliance with applicable community floodplain management ordinances, to <br />determine the proper insurance premium rate, and/or to support a request for a Letter of Map Amendment or Rev!sloJ'! (L.qMA or LOMA). <br />.' Instructions for completing this form can be found on the following page.. '.. . <br /> <br />a.M.B. No 3067-0077 <br />EMpires M.y 3', '993 <br /> <br /> <br />SECTION A PROPERTY INFORMATION <br /> <br />FOR INSURANCE COMPANY USE <br /> <br />POLICY NUMBe~ <br /> <br />STREET ADDRESS (Including Ap <br />-.-5'- ~ ~I <br />OTHER DESCRIPTION (Lot Block Numbers, etc.) <br />./ 0 '-:21& - ~/ - c:9/;L 0 ~ () D ~6 D - tJ.f-/ 0 <br /> <br />CITY ~~h.i:M ,4YTE <br />SECTION B FLOOD INSURANCE RATE MAP (FIRM) INFORMATION <br /> <br />COMPANY HAlC NUMBER <br /> <br />ZIP CODE <br />J3sY' 0 <br /> <br />Provide the following from the proper FIRM (See Instructions): <br /> <br />1. COMMUNITY NUMBER <br /> <br />2. PANEL NUMBER <br /> <br />3. SUFFIX <br /> <br />4, DATE OF FIRM INDEX <br /> <br />5. FIRM ZONE <br /> <br />8. BASE FLOOO ELEVATION <br />.Ll. 1:- (In AO ZoneI, ... depth) . <br />/ ;L -/7- 9/ r ( ~S~ <br /> <br />7. Indicate the elevation datum system used on the FIRM for Base Flood Elevations (BFE): DNGVD '29 D.Other ( escrlbe on back) <br />8. For Zones A or V, where no BFE is provided on the FIRM, and the community has established a BFE for this building site, Illdlcate <br />the community's BFE: I I I 1m. U feet NGVD (or other FIRM datum-see Section B, Item 7), " <br /> <br />) ~') 0 23.s - <br /> <br />ZJeo s- <br /> <br />L <br /> <br /> <br />SECTION C BUILDING ELEVATION INFORMATION <br /> <br />1. Using the Elevation Certificate Instructions, indicate the diagram number from the diagrams found on Pages 5 and 6 that best <br />describes the subject building's reference level_ . <br />2(a). FIRM Zones A 1-A30, AE, AH, and A (with BFE). The top of the reference level floor from the selected diagram Is at an elevation <br />of I I I 16'1 <II. ~ feet NGVD (or other FIRM datum-see Section B, Item 7). <br />(b). FIRM Zones V1-V30, VE, and V (with BFE). The bottom of the lowest horizontal structural member o{ihe r,ference level from <br />the selected diagram, is at an elevation of I I I I I I.U feet NGVD (or other FIRM datum-see Section B, Item 7). <br />(c). FIRM Zone A (without BFE). The floor used as the reference level from the selected diagram is W. U feet above 0 or <br />below D (check one) the highest grade adjacent to the building. <br /> <br />(d). FIRM Zone AO. The floor used as the reference level from the selected diagram Is W.U feet above 0 or below 0 (check. <br />one) the highest grade adjacent to the building. If no flood depth number is available, is the building's lowest floor (reference <br />level) elevated in accordance with the community's floodplain management ordinance? 0 Yes 0 No 0 Unknown <br />3. Indicate the elevation datum system used in determining the above reference level elevations: ~ NGVD '29 0 Other (describe <br />under Comments on Page 2). (NOTE: If the elevation datum used in measuring the elevations is different than that used on <br />the FIRM ISH Section 8, Item 7}, then convert the elevations to the datum system used on the FIRM and shoWthB conversion <br />equation under Comments on Page 2.) . . . <br />4, Elevation reference mark used appears on FIRM: 0 Yes 0' No (See Instructions on Page 4) <br /> <br />5. The reference level elevation is based on: 0 actual construction 0 construction drawings <br />(NOTE: Use of construction drawings is only valid if the building does not yet have the reference level floor In place, In which <br />case this certificate will only be v,alid for the building during the course of construction. A post-construction Elevation Certificate <br />will be required once construction is complete.) <br /> <br />6. The elevation of the lowest grade Immediately adjacent to the building Is: I I I 18ISI.l!.l feet NGVD (or other FIRM datum-see <br />Section B, Item 7), <br /> <br />SECTION D COMMUNITY INFORMATION <br /> <br />1. If the community official responsible for verifying building elevations specifies that the reference level Indicated In SecIJon C, Item 1 <br />is not the "'owest floor" as defined In the community's f.loodplaln management ordinance, the elevation of the bulldlng's~lowe8t <br />floor" as defined by the ordinance is: I I I I I I. U feet NGVD (or other FIRM datum-see Section B, Item 7). .,..,.. . <br />2. Date of the start of construction or substantial Improvement <br /> <br />fEMA Form 81-31, MAY 90 <br /> <br />REPLACES All PREVIOUS EDITIONS <br /> <br />SEE REVERSE SIDE FOR CONTINUATION <br />