Laserfiche WebLink
<br />;,If~~~!. .'~ ". '~,'" <br /> <br />SECTION E CERTIFICATION <br /> <br />This certification Is to be signed by a land surveyor, engineer, or architect who Is authorized by state or local law to certify elevation <br />information when the elevation Information for Zones A1-A30, AE, AH, A (with BFE),v1-V30,VE, and V (with BFE) Is required. <br />Community officials who are authorized by local law or ordinance to provide floodplain management information, may also sign the <br />certification. In the case of Zones AO and A (without a FEMA or community Issued BFE), a building official, a property owner, or an <br />owner's representative may also sign the certification. <br /> <br />Reference level diagrams 6, 7 and 8 - Distinguishing Features-If the certifier is unable to certify to breakaway/non-breakaway wall, <br />enclosure size, location of servicing equipment, area use, wall openings, or unfinished area Feature(s), then list the Feature(s) not <br />included in the. certification under Comments below. The diagram number, Section C, Item 1, must still be entered. ' <br /> <br />I certify that the Information In Sections 8 and C on this certificate represents my best efforts to Interpret the data available. <br />I understand that any false statement may be punishable by fine or imprisonment under t8 U.S. Code, Section tOOt. ' <br /> <br />CERTIFIER'S NAME <br />C. FRED DEUEL <br /> <br />LICENSE NUMBER (or Affix Seal) <br />#827 - #3896 <br /> <br />P.L.S. - P.E. <br /> <br />TITLE <br /> <br /> <br />COMPANY NAME <br />C. FRED DEUEL & ASSOCIATES <br />CITY <br />ZEPHYRHILLS FL 33541 <br />o 1 / 1 9Al~ 6 <br /> <br />ADDRESS <br /> <br />INC. <br />STATE <br /> <br />ZIP <br /> <br />Copies s ould be made of this Cert Icate for: 1) community official, 2) Insufance agentlcompany,encl3) ~lldlngowner. <br /> <br />813 7~i717 <br /> <br />COMMENTS: <br /> <br />" , <br /> <br />ON <br />SLAB <br /> <br />A V <br />ZONES ZONES <br /> <br />WITH <br />BASEMENT <br /> <br /> <br /> <br />ON ....... <br />PIERS, OR COLUMNS <br /> <br /> <br />The diagrams above illustrate the points at which the elevations should '?e measured In A Zones and V Zones. . <br />Elevations for all A Zones should be measured at the top of the reference level floor. <br />Elevations for all V Zones should be measured at the bottom of the lowest horizontal structural member. <br /> <br />Page 2 <br />