My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
96-5720
Zephyrhills
>
Building Department
>
Permits
>
1996
>
96-5720
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2009 2:51:28 PM
Creation date
7/18/2006 6:10:38 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
96-5720
Building Department - Name
PIZZA HUT
Address
GALL BV
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />PROPOSAL <br /> <br />& <br />l~ ,:. <br />::tfut . <br /> <br />CONTRACTOR: <br /> <br />M. B. Hayes, Inc. <br /> <br />DATE: April 4, 1996 <br />TELEPHONE: (813)962-1800 <br /> <br />ADDRESS: <br /> <br />14034 N. Florida Ave. <br />Tampa, Florida 33613 <br /> <br />GENERAL MANAGER: Mark A. Knapp <br /> <br />STORE NO.: 622081 <br /> <br />LOCATION: 6548 Gall Blvd <br />Zephvrhills FI <br /> <br />GENERAL NATURE OF JOB: Upqrade <br />flat deck roof <br /> <br />..--......................................--....................--............................................................................................................................... <br /> <br />SCOPE OF WORK: <br /> <br />1. Remove all air conditioning and refrigeration from flat <br />deck. <br /> <br />2. Tear off existing roof covering from flat deck. <br /> <br />3~ Tear off existing covering from mansard walls. <br /> <br />4. Upgrade decking and mansard walls as needed with plywood. <br /> <br />-. <br />5. Upgrade roof covering with single ply modified' bitumen <br />roofing system. <br /> <br />6. Install standing seam pans on mansard walls. <br /> <br />7. Reinstall all previously removed equipment and perform <br />startup. <br /> <br />Total material and labor $5,250.00 <br /> <br />Contractor hereby agrees to perform the above-stated work, supplying all mater/ills and labor, and to <br />complete the project In accordance wlth the terms and conditions as set forth on the back of this page which <br />are a part hereof (which Contractor acknowledges that he has read and agreed to prior to his executing this <br />Proposal) fo(the total sum. Including all taxes, permits, and fees, of Five thousand two - <br />hundred fifty and nol100 Dollars ($ 5,250.00 ). <br /> <br />M. B. Hayes, Inc. <br /> <br />Date: <br /> <br /> <br />By: <br />
The URL can be used to link to this page
Your browser does not support the video tag.