My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
96-5776
Zephyrhills
>
Building Department
>
Permits
>
1996
>
96-5776
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2009 2:51:13 PM
Creation date
7/18/2006 6:47:06 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
96-5776
Building Department - Name
CHERRY,WALTER
Address
6111 AGATE ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />REINSPECTION FEES: When extra inspection trips are necessary due to <br />anyone of the following reasons, a charge of Fifteen and 00/100 <br />Dollars ($15.00) shall be made for each trip for each trade: <br /> <br />a. Wrong Address <br />b. Condemned work resulting from faUlty construction. <br />c. Repairs or corrections not made when inspection called. <br />d. Work not ready for inspection when called. <br />e. Permit not posted on job site. <br />f. Plans not at job site. <br />g. Work not accessible. <br /> <br />,REPERHITTING FEES: Whenever a permit has expired, a repermitting <br />fee of one-half (1/2) the original permit fee shall be paid. <br /> <br />TIME EXTENSIONS: One 90 day extension will be granted where no <br />progress has been made due to hardship. Fee $15.00. <br /> <br />CHANGE OF CONTRACTOR: Fifteen and 00/100 Dollars ($15.00) for each <br />division with letter from parties involved. <br /> <br />REFUNDS ON PERMITS: <br /> <br />a. All applications for permit refunds shall be received within <br />three (3) months of permit issuance. <br /> <br />b. Plans examination fees are not refundable. <br /> <br />c. Ten and 00/100 Dollars (SI0.00) of the permit fee shall be <br />retained for administrative processing. <br /> <br />"AFTER THE FACT" PERMITS: Where construction has commenced prior <br />to the issuance of required permits, the permit fee shall be double <br />the normal fee. Any subsequent "after the fact" permits issued to <br />the same contractor within a twelve (12) month period shall be <br />triple the normal permit fee. <br /> <br />COMMERCIAL CHECK FEE: Twenty Dollars ($20.00). <br /> <br />HOME OCCUPATION APPLICATION FEE: Twenty Dollars ($20.00). <br /> <br />SITE PLAN REVIEW FEE - Minimum $150.00 or S10.00 per 1,000 GSF or <br />fraction thereof under roof or $50.00 per acre, or $20.00 per lot _ <br />Subdivision, whichever is greater. <br /> <br />P~VISED SITE PLAN - SI50.00. <br /> <br />P.U.D. - Minimum $500.00, or $10.00 per acres or fraction thereof, <br />whichever is greater. <br /> <br />CONDITIONAL USE - $500.00. <br /> <br />ANNEXATION - $500.00. <br /> <br />VACATING - Alleys - $80.00; Easements - $80.00; Rights-of-way - $80.00. <br /> <br />Per Ord. #481, 11/14/88 & Resol. 1230, 10/10/88 & Resol. 1282, 5/13/91. <br /> <br />q~ V~ <br />$ <br />
The URL can be used to link to this page
Your browser does not support the video tag.