Laserfiche WebLink
<br />EXTERIOR (CONTINUED) <br /> <br />WORK AND DESCRIPTION <br /> <br />ELECTRICAL WORK <br />Install a new 125 Amp. exterior <br />entrance service and panel. <br />(One service to Units 1 & 2, one <br />to units 3 & 4 and one to units <br />5 & 6). Remove all existing entrance <br />service equipment and conduit. <br />One meter box required for each unit. <br /> <br />Install new exterior, waterproof GFCI <br />outlet. <br /> <br />Install new door chimes with push <br />button. <br /> <br />Replace all exterior light fixtures. <br /> <br />CUM TOTAL <br /> <br />$12,200.00 <br /> <br />LOCATION <br /> <br />COST <br /> <br />ALL UNITS $3,600.00 <br />AT EXTERIOR <br />CONDENSER UNITS <br />(SEE PLAN) $400.00 <br />FRONT ENTRANCE $400.00 <br />ALL UNITS $375.00 <br /> <br />PAINTING - GENERAL SPECIFICATIONS <br />Paint the entire exterior of the units <br />including all exposed wood, concrete, <br />stucco, masonry and all ferrous metal. <br />Include painting of aluminum windows. ALL UNITS <br /> <br />The Harbor - Estimated Costs - Units 1 - 5 <br /> <br />$2,500.00 <br /> <br />PAGE TOTAt <br /> <br />$7,275.00 <br />$19,475.00 <br /> <br />CUM TOTAL <br /> <br />Revised August 22, 1995 <br /> <br />PROGRESS <br /> <br />Page 3 of5 <br />