<br /> CUM TOTAL $25,955.00 <br />INTERIOR (CONTINUED) <br />WORK AND DESCRIPTION LOCATION COST PROGRESS <br />ELECTRICAL WORK (CONTINUED) <br />Re-Iocate indicated light switch to <br />exterior light to allow for construction <br />of A./.C closet. KITCHEN 250.00 <br />Replace all exterior light fixtures. ALL UNITS <br />INSULATION <br />Install fiberglass insulation to <br />achieve R-19. ALL UNITS $1,725.00 <br />H.V.A.C. <br />Install a new 1.5 T. central heating and <br />air conditioning system complete with <br />all controls and electrical. (Minimum <br />SEER required - 10.0) 10KW heat <br />strip, Standard air cooled condensing <br />unit set on a concrete pad. (Heat pump <br />not required). ALL UNITS <br /> (SEE PLAN) $12,000,00 <br />Remove existing wall mounted furnace. <br />Fill opening/patch as required existing <br />wall, ALL UNITS: <br /> LIVING/DINING $1,000.00 <br />PLUMBING - GENERAL SPECIFICATIONS <br />PLUMBING FIXTURES <br />Install a new stainless steel <br />double compartment sink. Provide new <br />(fa ucets) (tra p)( spray). ALL UNITS: <br /> KITCHEN $1,125.00 <br />Install an insulation blanket on the existing <br />water heater(s). ALL UNITS $250.00 <br />PAINTING - GENERAL SPECIFICATIONS <br />Paint the entire interior of the <br />buildings including all walls, ceilings, <br />doors, trim, baseboard. ALL UNITS $2,200.00 <br />PERMITS AND FEES $400.00 <br />CLEAN UP $300.00 <br /> PAGE TOTAL $19,250.00 <br /> CUM TOTAL $45,205.00 <br /> -=-OTAL PROjECT $45,205.00 <br />I95-6OO\HARREVWP.1-5 <br />The Harbor - Estimated Costs - Units 1 - 5 Revised August 22, 1995 Page 5 of 5 <br />