My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
96-5824
Zephyrhills
>
Building Department
>
Permits
>
1996
>
96-5824
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2009 2:51:03 PM
Creation date
7/18/2006 8:58:48 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
96-5824
Building Department - Name
GRHAM,JENNIFER
Address
5131 17TH ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CONTRACT <br /> <br />,~ ' <br />AGREEMENT made this ~day of f4 ~y , 19~, by and between ACME FENCE hereinafter <br />referred to as "Acme Fence" and H r'i. G- rGt.hcu'Y'\ . hereinafter referred to as "Customer." <br />In consideration of the mutual convenants contained herein and the consideration to be paid by Customer to <br />Acme Fence, it is agreed as follows: , <br />1. Customer shall pay to Acme Fence the sum of $ Y 3 ~. 0 '& for the work described herein. <br />Payment shall be made to Acme Fence by the Customer upon completion unless otherwise specified. <br />2. Acme Fence agrees to furnish all necessary labor and materials to construct the improvements described <br />herein as per the specifications and drawings, if any, shown on the reverse side. Acme Fence further warrants all <br />materials will be as specified and that all work will be completed in a workmanlike manner according to standard <br />practices. <br />3. If this is a residential job, Customer represents and warrants that he is the owner of the property described <br />herein. If tIus is a commercial job, Customer represents that he is tJ1p owner of the property described herein, or a <br />contractor who has a contract to improve property owned by )/ fA <br />and that part of tile improvements contracted for by the owner incfude the work described herein. <br />4. Customer agrees to locate, relocate, stake and clear fence lines, and assumes full responsibility for same. <br />Customer agrees to indemnify and hold Acme Fence harmless for any liability or damages that may result from <br />Customer's failure to properly locate, stake and clear fence lines. Customer further agrees to advise Acme Fence of any <br />deed, subdivision, or other restrictions which may affect construction of the fence or other improvements to be <br />constructed by Acme Fence, and agrees to indemnify and hold Acme Fence hannless from any liability or damages that <br />may result because of tile failure to comply with deed, subdivision, or other restrictions. <br />5. Acme Fence does not assume any responsibility or liability for any damage of any nature to underground <br />obstructions. Customer agrees to clearly mark and advise Acme Fence of any underground obstructions in the area of the <br />fence line or the improvements to be constructed by Acme Fence. Customer assumes responsibility for any damage to <br />underground obstructions caused by Customer's failure to mark or advise Acme Fence of their existence. For pUIpOses of <br />this Agreement, underground obstructions include but are not limited to all improvements constructed underground <br />including utility pipes, cables, foundations, and the like. <br />6. It is agreed by and between tile parties, that any alteration or deviation from the above specifications involving <br />extra cost is to be performed by Acme Fence and will become an extra charge over and above the price stated herein. <br />7. Customer agrees to pay in full the price stated herein upon completion of work. Any failure to pay within <br />seven (7) days after receipt of the invoice shall be considered a default and Acme Fence shall be entitled to recover the <br />full amount o(the invoice plus interest (finance charge) at the rate of I 1/2% per month (18% per annum) until the <br />contract price is paid in full. In the event it becomes necessary for Acme Fence to take collection action, Customer <br />agrees to pay all costs of collections including reasonable attorney's fees and costs. <br />8. It is further agreed between the parties that the fencing materials shall remain personal property until the <br />contract price is paid in full. In the event the Customer fails to pay the contract price. Acme Fence shall have the right to <br />peaceably repossess and remove all materials installed by it on the premises. Customer further agrees that Acme Fence <br />shall have all of the rights of a secured party, as the same is defined under the Florida Uniform Commercial Code, and <br />that said rights shall be cumulative and in addition to any other rights which Acme Fence may have in accordance with <br />Florida Law. <br />9. TIus agreement is tile entire agreement of the parties and Carulot be changed except in writing signed by both <br />parties. There are no warranties or representations except as are expressed herein. Acme Fence specifically disclaims all <br />EXPRESS and IMPLIED WARRANTIES, including any WARRANTY OF MERCHANTABILITY or FITNESS FOR A <br />PARTICULAR PURPOSE. <br />IN WITNESS WHEREOF the parties have hereunto signed tIleir names on the day and year first above written. <br /> <br />ACME FENCE <br />By:d/ rJLa.~~;;(~..':'... <br /> <br />i}m~ y ~ .1:ft~111nL- <br />sto er <br /> <br />I year- (,JtLr;'(1I1-fy On Lct-b()r <br />Ll:LJFf>JlI' _uJa.rral\'fli () 1\ fY) €A f cr,'t.,-' <br />,-- / <br />
The URL can be used to link to this page
Your browser does not support the video tag.