Laserfiche WebLink
<br />. . Department of Communi ty Affairs SN: 3030 <br />FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION <br />FORM" 600A-93 ReGid~n.tia.l Component Prescriptive Method A CENTRAL <br />PROJECT NAME: GAUer RES. :BUILDER: NP CONSTRUCTION <br />ANn ADDRESS: LOT 85 SILVER OAK'S lPERMITTING :CLrMATE~ . <br />ZEPHERHILLts :OFFICE: :ZONE: 4~.~:_: 6:_: <br />OWNER: lPERMIT NO. :JURISDrCTrON NO. <br /> <br />New con6truction or addition <br />, Single family detached or Multifamily <br />If MUltifamily-No. of units <br />If MUltifamily, is this a worst case (yes/no) <br />Conditioned floor area (sq.ft.) <br />Predominant eave overhang (ft.) <br />Porch overhang length (ft.) <br />Glas6 area and type: <br />a. Clear Glasa <br />b. Tint, film or solar Screen <br />. Floor type and insulation: <br />a. Slab on grade (R-value, perimeter) <br />a.Net Wall type area and insulation: <br />a. Exterior: 1. Concrete (Insulation R-value) <br />a. Exterior: 2. Wood frame (Insulation R-value) <br />a. Adjacent: 2. Wood frame (Insulation R-value) <br />1.Ceiling type area and insulation: <br />a. Under attic (Insulation R-value) <br />~.Air di5t~ibution systems <br />a. Ducts (Insulation + Location) <br />3.Cooling system <br /> <br />CK <br /> <br />1. New Construction <br />attached 2. Single-Family <br />3. 0 <br /> <br />t.Heating System: <br /> <br />i.Hot water system: <br /> <br />..not Water Credits: eRR-Heat Recovery, <br />DHP-Dedicated Heat Pump) <br />'.Infiltration practice: 1. 2 or 3 <br />. HVAC Credits (CF-Ceiling Fan, CV-Cross vent, <br />HF-Whole house fan, RB-Attic radiant <br />barrier, MZ-Multizone) <br />.EPI (must not exceed 100 points) <br />a. Total As_Built points <br />b. Total Base points <br /> <br />4. <br /> <br />5. 2005.00 <br />6. 2.00 <br />7. 8.00 <br />Single Pane <br />8a.381.0sqft <br />8b. O.Osqft <br /> <br />Double Pane <br />O.OOsqft <br />O.OOsqft <br /> <br />9a.R~ 0.00 , 236.40 ft <br /> <br />10a-1 R= 5.00. 1501. OOsqft~_.. <br />lOa -2 R= 11. 00, 227. OOsqft._ <br />10a-2 R=11 .00, 336.00sqft~ <br /> <br />1 1 a . R = 1 9 . 00 . 2005. 00 s q f t _~._ <br /> <br />12a. R= 6.00, uncond <br />13. Type: Central A/C <br />SEER: 10.20 <br />14. Type: Heat Pump <br />HSPF: 7.50 <br />15. Type: Electric <br />EF: 0 . 97 <br /> <br />16. <br /> <br />17. <br />18. <br /> <br />2 <br /> <br />19. <br />19a. <br />19b. <br /> <br />80.34 <br />27779.63 <br />34575.60 <br /> <br />----------------------------------------------------------------------------~ <br /> <br />Review of the plans and specifications <br />covered by this calculation indicates <br />compliance with the Florida Energy <br />Code. Before construction is completed <br />this building will be inspected for <br />compliance in accordance with Section <br />553.908 F.S. <br /> <br /> <br />I <br />j <br />t <br />, <br />I <br />! <br />I <br />I <br />( <br />I <br />, <br />I <br />I <br />- I <br />I <br />I <br />hereby certify that this building is : <br />compliance with the Florida Energy : <br />iE: . : <br />f <br />I <br />I <br />I <br />f <br />I <br /> <br />-IER/AGENT: <br />rE: <br /> <br /> <br />BUILDING OFFICIAL: <br />DATE: <br />