Laserfiche WebLink
<br />/~ <br /> <br />ARIUY ENGINEERING, INc. <br />structural engineers <br /> <br />June 7, 1996 <br /> <br />BOZETECH, Inc. <br />Post Office Box 97 <br />San Antonio, Florida 33576 <br /> <br />Attention: Steve Bozeman <br /> <br />Re: Vaulted Gable Detail on 3650 Square Foot Duplex <br />(Arkay Engineering, Inc. Job #1280) <br /> <br />Dear Steve: <br /> <br />This letter is to confirm our conversation regarding the truss to <br />block wall connection for the vaulted gable detail on the above <br />stated project. <br /> <br />The Hughes "HTA20" straps can be eliminated but the 1/2" X 8" long <br />j-bc;>lts MUST be spaced at 24" O.C. and the bottom chord of the <br />truss nailed to the 2" X 6" pressure treated plate with 16d nails <br />spaced at 8" O.C. <br /> <br />If you have any questions or require any further assistance with <br />this matter, please contact our office. <br /> <br />Sincerely,. <br /> <br />A~~ji~jt;~:ring. Inc. <br />//AA /1' uI.{ <br /> <br />~Richard u. Ki~ey, P.E. <br />President <br /> <br />Florida License #37296 <br /> <br />921 Shadow Drive - Suite #10 - Lakeland. Florida 33809 <br />Phone: 941-853-2711 Fax: 941-853-8593 <br />