Laserfiche WebLink
<br />SUMMER CALCULATIONS <br /> <br /> 1 BASE 1 BASE GLASS ! SINGLE- <br /> GLASS x SUMMER = SUMMER SUMMER PO <br /> AREA PT. MUL T. POINTS AREA CLfAR <br /> N Zb 82.2 '7-\"2,/ N 2" (51.0) <br /> NE 82.2 NE Lf:. <br /> E \Ll- 82.2 115/ E \4 (109. ~ <br /> SE 82.2 SE T12.J <br /> S S~ 82.2 LI- 52 \ S <;~ f100 y <br /> SW 82.2 SW 112.9 <br /> W 82.2 W 109.2 <br /> NW 82.2 NW 77.2 <br /> H' 82.2 H' 367.7 <br />~ <br />:5 <br />CJ <br /> " ... <br /> .15 f COND 1 TOTAL l BASE 1 BASE I ADJUSTED <br /> FLOOR GLASS ADJUST. GLASS = GLASS <br /> AREA I AREA I FACTOR T SUBTOTAL T BASE SP <br /> .15 I 1'2.4-~ I q..:; I I' Cf 7 I I?S'CJ'1 I I 53"l5LJ.., <br /> l' <br /> COMPONENT 1 BASE SUMMER I BASE COM <br /> DESCRIPTION AREA x POINT. MUL T. = SUMMER DESC <br /> POINTS <br /> EXTERIOR err ( 1.0 C{ 1\ RLO <br />::l ADJACENT '<.?~ .7 '2... ~. C. FR ~ <br />; <br /> <br />PANE DOUBLE-PANE <br />INT MUL T. OR SUMMER POINT MUL T. <br />TlNJ2 CLEAR TlNJ2 <br />51.5 47,8 43.5 <br />76.6 71.7 63.4 <br />107.1 102.0 87.3 <br />110,3 104.1 89.4 <br />98.3 90.9 78.8 <br />110.3 104.1 89.4 <br />107.1 102.0 87.3 <br />76.6 71. 7 63.4 <br />303.3 324.6 238.1 <br /> <br /> <br />. <br />AS-BUILT <br />GLASS <br />SUBTOTAL <br /> <br />),.) ....;;"') <br />f -.A .. <br /> <br /> <br />. <br />AS-BUILT <br />SUMMER <br />POINTS <br /> <br />---I ~~ ' ( <br />1".7 ~!. (., <br /> <br /> . <br />rn EXTERIOR ~ 4.8 ~~ I I :r N "'\~ U\, ml '2-0 ~ 4, r5 <br />1.6 \~ I, (, <br />8 ADJACENT <br /> . <br /> <br />CJ UNDER ATTIC '24~ .6 -, 76 f<' - \ '-'\ I '2Jf '<, \, \ 1:+ L'L <br />z OR SINGLE .6 <br />::I <br />iii ASSEMBLY <br />0 BASE CEILING AREA EOUALS FLOOR AREA DIRECTLY UNDER CEILING. AS-BUILT CEILING AREA EQUALS ACTUAL CEILING SQUARE FOOTAGE. <br /> <br />a: SLAB (PERIMETER / GS -31.8 - 52. 4, $-o-ft- 11oS" --C,I ,'-'( - .:s ? (" q. <br />8 RAISED (AREA) -3.43 <br />....I <br />Ii.. <br /> FOR SLAB ON GRADE USE PERIMETER LENGTH AROUND CONDITIONED FLOOR FOR RAISED FLOORS USE AREA OVER UNCONDITIONED SPACE. <br /> <br /> <br />. <br /> <br />INFILTRATION <br /> <br /> <br />10.9 <br /> <br />TOTAL COMPONENT BASE SUMMER POINT~ <br />. <br />COOLING BASE COOLING TOTAL BASE <br />SYSTEM x SUMMER = <br />SYSTEM MULTIPLIER POINTS <br />.37 2 5 ~7 I '6 <br /> <br />HOT <br />WATER <br />SYSTEM <br /> <br /> <br />AS-BUILT <br />HOT WATER <br />SYSTEM DESC. <br />I <br /> <br />BASE <br />x HOT WATER = <br />MULTIPLIER <br />3527 <br /> <br />. <br /> <br />'~~ <br /> <br />. <br /> <br />. <br /> <br />. <br />\ 'i? 2. rL- ') <br />____....___J <br /> <br />AS-BUILT <br />COOLING <br />POINTS <br />5"3 b \ <br /> <br />NUMBER <br />OF x <br />BEDROOMS <br />~ <br /> <br />'H = HORIZONTAL GLASS (SKYLIGHTS) <br /> <br />2FOR GLASS WITH KNOWN SHADING COEFFICIENT, SEE SECTION 1.1 OF APPENDIX C. TINT MULTIPLIERS MAYBE <br />USED FOR GLASS WITH SOLAR SCREENS, FILM, OR TINT. <br /> <br />-2- <br />