Laserfiche WebLink
<br /> <br />roposal <br />BAY AREA ROOFING <br />Oi.l.C,S. 4261 112 Terrace North · Clearwater, FL 34622 · <br />STATE CERTIFIED ROOFING CONTRACTOR <br />FULLY INSURED <br />PRO ~BMITTED 70 <br /> <br />578-11 ~__ <br />-.----' <br /> <br />#CCCA25484 <br />FREE ESTIMATES <br />] DAT~ -;1 0 9{; <br /> <br />.. <br /> <br /> <br />OTHER <br /> <br />PHONE <br /> <br />o <br /> <br />TILE ROOF <br />1. Remove existing ( ) down g. Install all new tile, customer to choose style and color - flat <br />to bare wood. ---- or barrel <br />2. a. 301b. felt paper base sheet, nailed -------___ 3.~~ aRej ml'tterials <br />b. Tile granule underlayment hot mopped with tar ~.~ean and haul away all debris <br />c. New galvanized metal valleys - ..-- 5:r---4~ar labor guarantee <br />d. New metal eaves drip- brow . natural 6. Contractor ull permits and make necessary calls for <br />e. Proper flash in if n inspections. <br />f. New lead bOo s over all vent pipes Price: <br /> <br />1. Remove existing ( <br />to bare wood.-_. <br />2. a. 30tb. felt paper base Shem;'fl8H9 <br />b. Granule underlayment installed with hot tar <br />c. New galvanized metal valleys <br />d. New metal eaves drip if neede <br />e. Install tile to match el!isliRg es as close as pos- <br />sible. If tile is notl'flailufactured and not available the <br />contractor reserves the right to use the existing tile. Price: <br /> <br />SHINGLE ROOF <br /> <br />. Insta.!!Jlaw fiber~lass shingles ( <br />3. YJ'PIYalllabor and materials <br />. Clean and haul away all debris <br />5. ) year labor guarantee <br />ear manufacturing warranty on shingles only <br />6. ontrac nd ull permits and make necessary calls for <br />inspections. <br />Price: <br /> <br />) down <br /> <br />TILE REPAIR <br />3. Supply all labor and materials <br />4. Clean and II debris <br /> <br /> <br />5. ( ) year labor guarantee <br />ontractor to pay and pull permits and make necessary calls for <br />In . <br /> <br /> <br />1. Remove existing ( ) down <br />to bare wood. <br />2. a. 2112 to 4/12 pitch 2 ply's of H515:felt paper._... <br />b. 1 layer of 30 lb. felt paper if above 4/12 pitch -. <br />c. New metal eaves drip - brown/white/oatynn- <br />d. New lead boots over all.\{ent.pi~-- <br />e. Proper flashing ifnesoed <br />f. New galvanized metal valleys <br /> <br />) color <br /> <br /> <br />1. Remove existing ( <br />to bare wood. <br />2. a. 2/12 to 4/12 pitch 2 ply's of15Ib. felt paper:..-__ <br />b. 1 layer of 30 lb. felt paper if above 4/12 pitch <br />c. New metal eaves drip if needed <br />d. New lead boots over all vent pipes <br />e. Proper flashing if needed ../ <br />f. Install 18" mineral paper starter strips at all eaves <br />before installing shingles <br /> <br />MOBILE HOME SHINGLE ROOF <br />) down g. Install new fiber lass shingles ( <br />3. Supply all labor an :ia1s <br />4. Clean away all debris <br />ear labor guarantee <br /> <br />) color <br /> <br /> <br /> <br />( ) year manufactunng warranty on shingles only <br />6. Contractor to pay and pull permits and make necessary calls <br />for inspections. <br />Price: <br /> <br />1. Remove existing builtup roof <br />2. a. Glass - base sheet nailed. <br />b. ( ) ply's 15 lb. fiberglass <br />mopped with tar <br />c. Proper tie-in from main house to flat roof <br />d. New metal eaves drip around per" <br />brown/white/natural _ <br />e. Aluminum coatin finish <br /> <br />MODIFIED BITUMEN ROOF SYSTEM (Commonly referred to as Single-Ply) <br /> <br />1. Remove existing built up roof 3. Supply all labor and ate rials <br />2. a. Glass base sheet nailed --____ 4. u away all debris <br />b. Install Modified Bitumen Roof System . ( ) year factory warranty <br />c. Proper tie-in from main hoys..e.J ontractor to pay and pull permits and make necessary calls for <br />d. New metal eavMonparound perimeter of inspec 10 . <br />flat roof. <br />e. Aluminum coatin finish or ranulated finish <br /> <br />Extra work: '/ A Ny we 00 uJ }l ( DQ <br /> <br /> <br />? ~eh1~~ velV't- 0/) <br /> <br />BUILT UP ROOF <br />1. Remove existing built up roof down to bare wood 3. Supply all labor and materials <br />2. a. 43.lb. base sheet nailed 4. Clean and haul away all debris <br />b. ( .::? ) ply's 151b. felt hot mopped with tar - 5. (7 ) year labor guarantee <br />c. PrtSPer tie-in from main house to flat roof 6. Contractor to pay and pUll permits and make necessary calls for <br />d. New metal gravel stop around perimeter of flat roof inspections. / /.., ''') 00 <br />e. Hot tar flood coat and gravel finish Price: 7.. L~ 6 - <br /> <br />BUILT UP ROOF (SMOOTH SURFACE) <br />3. Supply all labor and m terials <br />4. Clean and debris <br />5. ear labor guarantee <br />. Contra~tor to pay and pull permits and make necessary calls for <br /> <br />at <br /> <br /> <br />Price: <br /> <br />Price: <br /> <br />fJ/L,'c-e~ <br />R ~ 0 t-. <br /> <br />fly 5 GI~OA; reJj <br /> <br /> <br />We Propose hereby to furnish material and labor. complete in accordance with above specifications. for Ihe sum of to be paid according 10 the payment <br />/' schedule set forth below. unless job is not completed. 0 0 <br />rOO/(-r#cJd.5/-)ND 5 QJ eN /?U/VJ}/UA /U/CJ./1 b ~() dollars($ Lf 7~ 0 <br />Payment to be made as foJls>wr ~ <br />lJ.Ld ~b DownPaymenl ~Q- <br /> <br />(! J M .P ~..t2- -j-) t1 "Y\. ) 0 F \)0 iJ Balance l./ '7.:l 0 .~ <br /> <br />~~~~~~:d ~/2h~ 8(~/~~ <br /> <br />Nole: This proposal may be <br />withdrawn by us If not accepted within <br /> <br />ON <br /> <br />All unpaid and outstanding balances due hereunder shall <br />be subject to a service charge of 1.5% per month beginning <br />from date due. <br /> <br />days. <br /> <br />Acceptance of Proposal - The above prices. specifications <br />and conditions are satisfactory and are hereby accepted. You are authorized <br />to do the work as specified. Payment will be made as outlined above. <br /> <br />Date of Acceptance -x-----2 - 2Q~~J 6. <br /> <br />TERMS AND CONDITIONS ON REVERSE SIDE <br /> <br />Signatur~ 11 P!~f (l'tl Q 12 <br />Signature X 5s ~ .:s ~ 9 - ;) 0 - 9' 7 7 V <br />