Laserfiche WebLink
<br />FORM 600A-93 <br />PROJECT NAME: <br />AND ADDRESS: <br />5:< '17 }(~~ff <br />OWNER: U <br /> <br />Department of Community Affairs <br />FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION <br />Residential Component Prescriptive Method A <br />Habitat for Humaniti BUILDER: Habitat for Humanities <br />RMITTING CLIMATE <br />Zephyrhills, FL 3354 OFFICE: ZephyrhilJs ZONE: 41XI 51_1 61_1 <br />PERMIT NO. bs-/.;;:L B JURISDICTION NO. 611600 <br />CK <br /> <br />SN: 1234 <br /> <br />CENTRAL <br /> <br /> <br />1. New construction or addition <br />2. Single family detached or Multifamily attached <br />3. If Multifamily-No. of units <br />4. If Multifamily, is this a worst case (yes/no) <br />5. Conditioned floor area (sq.ft.) <br />6. Predominant eave overhang (ft.) <br />7. Porch overhang length (ft.) <br />8. Glass area and type: <br />a. Clear Glass <br />b. Tint, film or solar screen <br />9. Floor type and insulation: <br />a. Slab on grade (R-value, perimeter) <br />10.Net Wall type area and insulation: <br />a. Exterior: 2. Wood frame (Insulation R-value) 10a-2 R=14.30, 828.70sqft____ <br />11.Ceiling type area and insulation: <br />a. Under attic (Insulation R-value) <br />12.Air distribution systems <br />a. Ducts (Insulation + Location) <br />14.Heating System: <br /> <br />1. <br />2. <br />3. <br />4. <br />5. 964.00 <br />6. 2.00 <br />7. 6.00 <br />Single Pane <br />8a.136.2sqft <br />8b. O.Osqft <br /> <br />New Construction <br />Single-Family <br />o <br /> <br />Double Pane <br />O.OOsqft <br />O.OOsqft <br /> <br />9a.R= 0.00 , 129.30 ft <br /> <br />11a.R=33.30 , 964.00sqft____ <br /> <br />15.Hot water system: <br /> <br />12a. R= 6.00, uncond <br />14. Type: Strip Heat <br />COP: 1.00 <br />15. Type: Electric <br />EF : 0 . 95 <br /> <br />16.Hot Water Credits: (HR-Heat Recovery, <br />DHP-Dedicated Heat Pump) <br />17. Infiltration practice: I, 2 or 3 <br />18.HVAC Credits (CF-Ceiling Fan, CV-Cross vent, <br />HF-Whole house fan, RB-Attic radiant <br />barrier, MZ-Multizone) <br />19.EPI (must not ~xceed 100 points) <br />a. Total As Built points <br />b. Total Base points <br /> <br />16. <br /> <br />17. <br />18. <br /> <br />2 <br /> <br />19. <br />19a. <br />19b. <br /> <br />98.68 <br />23005.95 <br />23314.81 <br /> <br />------------------------------------------------------------------------------- <br /> <br />------------------------------------------------------------------------------- <br /> <br />I Hereby certify that the plans and <br />specifications covered by this calcu- <br />lation are in compliance with the <br />Florida E~e.__ <br /> <br />PREPARED ~ <br />DATE: ~l . <br /> <br />Review of the plans and specifications <br />covered by this calculation indicates <br />compliance with the Florida Energy <br />Code. Before construction is completed <br />this building will be inspected for <br />compliance in accordance with Section <br />553.908 F.S. <br /> <br />I hereby certify that this building is <br />in compliance with the Florida Energy <br />Code. <br /> <br />OWNER/AGENT: <br />DATE: <br /> <br />BUILDING. of,}~IAL' '$'U.:~"'r <br />DATE: ~ 1 <br />, <br />