Laserfiche WebLink
<br />BUILDING PERMIT N~ <br /> <br />CITY OF ZEPHYRHILLS Permit <br />(813) 788-6611 Date .-$/-- d - 9 P <br /> <br />, <br /> <br />".- ~ <br /> <br />66111:: <br /> <br />BUILDING <br /> <br />......-------... <br /> <br />~~~~/) PLUMBING <br /> <br />MECHANICAL <br /> <br />Sewer Conn <br /> <br />Water Conn: <br /> <br />p<opertyowne'~~ <br />Job Address: ----.: ~ _ _ : - <br />Parcell.D. # <br /> <br />Water Meter: <br />T.I.F.'s: <br /> <br />...J(J <br /> <br />Energy Code: Radon Gas: <br /> <br />tJ..A--'i'? '"jf" t/ 1L?--L~1x1 <br />tr / <br /> <br />Zoning: <br />Description of Work <br /> <br />NO OCCUPANCY BEFORE C.O. <br /> <br />FINAL <br />C.O. <br /> <br /> <br />17 <br />DATE <br /> <br />Complete Plans, Specifications and Fee Must Accompany Application. <br />All work shall be performed in accordance with City Codes and Ordinances. <br /> <br />DATE <br /> <br />Inspector <br /> <br />Permit Fee ~O. ~ <br />~ - <br />Signature ,/ '"7 ~ <br /> <br />Company <br /> <br />Address <br /> <br />Telephone# <br /> <br />Valuation or <br />Contract Price <br /> <br />.AJ;/ A- <br />,~-y <br /> <br />City License Registration # <br />State Certified License# <br /> <br />.~;tt:zL <br /> <br />BUILDING <br /> <br />ELECTRICAL <br /> <br />PLUMBING <br /> <br />MECHANICAL <br /> <br />Tp. Servo <br />Rough In <br />Meter Can <br />Const. Pole <br />Pool <br />Pre-Meter <br />Final <br /> <br />Breakers <br />Ducts Insl. <br /> <br />Compressor <br />Final <br /> <br />SLB <br />Tub Set <br />Water <br />Sewer <br />Final <br /> <br />Ftr. <br />Pre SLB <br />Lintel <br />FRM. <br />Insul. CL <br />WL <br /> <br />Driveway <br /> <br />REINSPECTION FEES: When extra inspection trips are necessary due to anyone of the following reasons, a <br />charge of Fifteen and 00/100 Dollars ($15.00) shall be made for each trip for each trade: <br /> <br />a. Wrong Address <br />b. Condemned work resulting from faulty construction. <br />c. Repairs or corrections not made when inspection called. <br />d. Work not ready for inspection when called. <br />e. Permit not posted on job site. <br />f. Plans not at job site. <br />g. Work not accessible. <br /> <br />The payment of inspection fees shall be made before any further permits will be issued to the person owning <br />same. <br />