Laserfiche WebLink
<br />P.04 <br /> <br />Permit No <br />P"t'ojecc Name: <br />Page <br /> <br />4616707.00 <br />Ze:pbyrh:i.l:'s Hedicdl Cenc..,r: <br />2 <br /> <br />chis project. The f'ermit:ce:c shall tnform the D~_sc:ricc in '..r:it.:ing of r:he <br />name I addr:e$:oi .and phone ..\l!TIber of the professicilal eng1n.;.e.r 50 employed. <br />This informacion shall be submitted prior co construction. <br /> <br />4. <br /> <br />The operation and maintenance. entity <br />the form required by r..he D1-stl'ict. <br />scr-.edule. <br /> <br />shall submic inspection reports in <br />in accordance '..;i ch 1:he fol1o...ing <br /> <br />() For s.ystems ucil1.z1ng effluent: filcl.:'ation or exfiltrat:ion, the <br />inspeccions shall be performed 18 monchs after operation is <br />authorized and every 18 monc.hs thereafter. <br />(X) For systems utilizing retention or wet detention, the inspectiuns <br />shall be performed t.wo (2) years after operation is authorized and <br />every two (2) years thereafter. <br />For systems utilizing effluent filtration or exfi.ln.-ation Clnd <br />retention or wet detention, the inspections shall be performed 18 <br />months after opera cion is authorized and every 18 months thereafter. <br /> <br />5. If limeston(! bedrock is encountered during cO,lst-t"l..lction of the surface <br />water management system, the District must be notified and construction in <br />tho affected area shall cease. <br /> <br />6. \.ii thin 30 days. afee"!.- ('omp 1e cion of construction of the permi t;ted aceivi ty. <br />the Permittee shall submit co the Brooksville Se~vice Office a written <br />statement of completion and certification by a registered professional <br />engineer or other appropriate individual as authorized by law, utilizing <br />the required Stdtsment of Completion and Requesc for Transfer to Operation <br />Entity form idencified in Chapter 400-1, F.A.C.. and signed, dated, and <br />sealed. a".bv.ilc: cira'..;ings. The as-built: dra.....ings shall identify an)' <br />deviations from the approved construction drawings. <br /> <br />7. For dry bottonl t'etencion systems, the retention area(s) shall become dry <br />within 72 hours after a rainfall event. If a retention area is regularly <br />wet, this situation shall be deemed to be a v~olation of this permit. <br /> <br />8. nH~ Permittee shall notify the District of any sir.khole development in chE! <br />surface water management system within 48 hours of discovery and must'. <br />s\Jbmit a detailed sinkhole evaluation and repair plan for approval by the <br />District within 30 days of discovery. <br /> <br />9. The Dist.rict reserves the };.'ight. upon prior not-ice co che Permittee, to <br />conduct on-site research to assess the pollutant removal efficiency of the <br />surface watel; management system. The Permittee may be req\11r-ed to <br />cooperate in this regard by allowing on-si~e access by District <br />representatives, by allowing the installation and operation of cesting and <br />monitoring equipment, and by allowing other assistance oeasures as needed <br />on site, <br /> <br />10. Re fe r to GENERAL CONDITION No. 15 here in. <br />