Laserfiche WebLink
<br />78/79 CABINETS - KITCHEN BASE <br />CABINETS - KITCHEN UPPERS <br />Furnish and install new Formica cabinets and counter <br />tops due to water damage. <br />Layout of new cabinets is to match existing layout <br />Construct a new drywall soffit above upper cabinets KITCHEN <br /> <br />- <br /> <br />85 <br /> <br />PLUMBING FIXTURES <br />Furnish and install new faucets and traps and <br />all necessary parts <br /> <br />Install a new 40-gallon water heater <br /> <br />Furnish and install tub and shower <br />valve. Contractor may remove drywall from <br />kitchen to gain access to plumbing <br /> <br />Furnish and install new water closet and all <br />necessary parts <br /> <br />Furnish and install new stainless steel sink and <br />all traps and parts and faucets. <br /> <br />19 <br /> <br />CARPET <br />Furnish and install new carpeting over new <br />padding and remove all existing tack strips and <br />install new ones. Carpet to be installed over <br />clean floors. <br /> <br />20 <br /> <br />RESILIENT FLOOR COVERING <br />VINYL TILE <br />Remove existing floor tile and install new VCT <br />tile <br /> <br />Page No 4 - <br /> <br />BATHS I & 2 <br /> <br />STORAGE ROOM <br /> <br />BA TH I <br /> <br />Baths 1 & 2 <br /> <br />KITCHEN <br /> <br />ALL BEDROOMS, <br />ALL CLOSETS <br />HALLWAYS <br />LIVING ROOM <br /> <br />KITCHEN <br />DINING ROOM <br />BATHS 1 & 2 <br />STORAGE ROOM <br />4'X4' BY FRONT <br />DOOR <br /> <br />P AGE TOTAL <br />