Laserfiche WebLink
<br />AHU Type Duct Location R-value <br /> <br />----------------------------------- ---------------------- ------- <br /> <br />1. Split / PTAC Air Conditioner Ventilated 6 <br />411.-----PUMPS AND PIPING-ZONE 1----------------_______________________ <br />Type R-value/in Diameter Thickness <br /> <br />------------------------ <br /> <br />1. Non-Circulating 5 1 1 <br />412.-----WATER HEATING SYSTEMS-ZONE 1--------------____________________ <br />Type Efficiency StandbyLoss InputRate Gallons <br /> <br />---------- -------- --------- <br /> <br />------------------------ ---------- ---------- ---------- ---------- <br /> <br />1. > 12 kW <br />2. <=12 kW <br />413.-----ELECTRICAL POWER <br /> <br />o .006 18 80 <br />.9 0 6 40 <br />DISTRIBUTION--------__________________________ <br />CHECK <br /> <br />Metering criteria in 413.1.ABC.1 have been met. <br />Transformer criteria in 413.1.ABC.2 have been met. <br /> <br />414.-----MOTORS---------__________________________________________ _____ <br /> <br />Motor efficiencies in 414.1.ABC.1 have been met. <br />415.-----LIGHTING SYSTEMS-ZONE 1--------------_________________________ <br />Space Type No Control Type 1 No Control Type 2 No Watts Area(Sqft) <br /> <br />---------- -------------- -------------- ------ ---------- <br />Toilet and 1 On/Off 2 None 0 600 560 <br />Kitchen 1 On/Off 2 None 0 600 380 <br />Washing 1 On/Off 2 None 0 250 215 <br />Conference 1 On/Off 8 None 0 8000 4845 <br /> Total Watts for Zone 1 9450 <br /> Total Area for Zone 1 6000 <br /> Total Watts = 9450 <br /> Total Area 6000 <br /> CHECK <br /> <br />Lighting criteria in 415.1.ABC have been met. <br /> <br />------------------------------------------------------------------ <br /> <br />16. HVAC load sizing has been performed. (407.1.ABC.l) <br /> <br />------------------------------------------------------------------ <br /> <br />17. Duct sizing and design have been performed. (410.1.ABC.l.2) <br /> <br />------------------------------------------------------------------ ----- <br /> <br />18. Testing and balancing will be performed. (410.1.ABC.4) <br /> <br />------------------------------------------------------------------ <br /> <br />19. Operation/maint€nance manual will be p~ovided to owner.(102.1) <br /> <br />---------------------------------------------------------------------------- <br />