My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
98-7617
Zephyrhills
>
Building Department
>
Permits
>
1998
>
98-7617
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2009 3:16:57 PM
Creation date
8/23/2006 6:34:31 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
98-7617
Building Department - Name
STEMEA,MYRNA
Address
7322 LEHIGH CT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />r";lirr'Jle Zones 4 5 6 <br /> <br /> MINIMUM INSULATION <br /> COMPONENT INSULATION INSTALLED <br /> Concrete R.5 <br />en Frame, 2' x 4' R.11 <br />....J Frame, 2' x 6' R-19 <br />....J <br />~ Common, Frame R-11 <br />~ <br /> Common, Masonry R-3 a,,-5' <br />~ Under Attic R-30 <br />z Single Assembly; enclosed ~ ~ <br />:J <br />W Single Assembly; Opened R-10 <br />0 Common, Frame R-11 <br />en Slab-on-grade No Minimum S[~ <br />a: Raised Wood R-11 <br />0 <br />0 Raised Concrete R-5 <br />....J Common, Frame <br />~ R-11 <br />f- <br />0 In unconditioned space R-6 <br />::> <br />0 In conditioned space No minimum <br /> <br />TABLE 6C.1 : PRESCRIPTIVE REQUIREMENTS FOR SMAll AODf1l0NS (600 Sq. Fl and Less), RENOVATIONS TO EXISTING BUILDINGS AND SITE-INSTALLED COMPONENTS OF MANUFACTURED HOMES. <br /> <br />MINIMUM INSTALLED <br />EFRCIENCY EFRCIENCY <br />SEER 10.0 SE <br />SEER 9.7 ER <br />EER 8.5* EER <br /> <br />EQUIPMENT <br /> <br />Cl <br />Z <br />::; <br />o <br />o <br />u <br /> <br /> <br />- Split <br />Ie Pkg. <br />Room unit or PT <br /> <br />Cl <br />Z <br />~ <br />UJ <br />:r: <br />UJ <br />u <br /><l: <br />0- <br />(f) <br /> <br />AFUE <br />AFUE <br /> <br />ex:: <br />I- UJ <br />01- <br />:r:<l: <br />:s: <br /> <br />Elect' Resistance <br />G ; Natural or L.P. <br />F elOi! <br /> <br />EF <br />EF <br />EF <br /> <br />.88 <br />.54 <br />.54 <br /> <br />TABLE 6C-2: PRESCRIPTIVE REQUIREMENTS FOR GLASS AREAS IN ADDITIONS ONLY <br /> <br />. See Table 6.3. 6,7 <br /> <br />Maximum percentage glass to floor area allowed is selected by type, overhang length, and shading coefficient. Maximum%- Installed % - <br />GLASS TYPE, OVERHANG, AND SHADING COEFFICIENT REQUIRED FOR GLASS PERCENTAGE ALLOWED <br />UP TO 20% UP TO 30% UP TO 40% UP TO 50% <br />Single Double Single Double Single Double Single Double <br />OH-SC OH-SC OH - SC OH - SC OH-SC OH - SC OH-SC OH-SC <br />1'- 1.0 0'- .90 2'- 1.0 1'- .90 3'- 1.0 2'- .90 4'- 1.0 3'- .90 <br />0'- .86 1'- .86 0'- .70 2'- .86 1'- .70 3'- .86 2'- .70 <br /> 0'- .65 1'- .65 0'- .50 2', .65 1', .50 <br /> 0'- .45 1'- .45 0'- .40 <br /> 0', .35 <br />Shading coefficients (SC) may be obtained from the manufacturer. Single clear SC = 1.0, double clear SC = .90, and single tint SC = .86. <br />TABLE 6C-3 I MINIMUM REQUIREMENTS FOR ALL PACKAGES <br />COMPONENTS SECTION REQUIREMENTS CHECK <br />Exterior Joints & Cracks 606.1 To be caulked, gasketed, weather-stripped or otherwise sealed. t,./"'" <br />Interior Joints & Cracks 606,1 All openings in interior surfaces of ceilings and exterior walls must be sealed. ..--- <br />Sole & Top Plates 606.1 :SOle plates and penetrations through top plates of exterior walls must be sealed. ../"" <br />Infiltration Barrier 606.1 Infiltration barrier must be installed in exterior walls & raised wood floors. --- <br />Fireplaces 606.1 Fireplaces must have flue dampers, glass doors and outside combustion air intakes. <br />Exhaust Fans 606.1 Exhaust fans vented to unconditioned space shall have dampers, except for combustion <br /> devices with integral exhaust ductwork. <br />Combustion 606.1 Combustion space and water heating systems must be provided with outside combustion air, <br />Heating except for direct vent appliances. <br />Water Heaters 612.1 Comply with efficiency requirements in Table 6-11. Switch or clearly marked circuit breaker (electric) <br /> or cutoff (gas) must be provided. External or built-in heat trap required. <br />Swimming 612.1 Spas & heated pools must have covers (except solar heated). Non-commercial pools must have a <br />Pools & Spas pump timer. Gas spa & pool heaters must have minimum thermal efficiency of 78%_ <br />Hot Water Pipes 612.1 Insulation is required for hot water circulating systems, (including heat recovery units) and the first <br /> 8' of piping from the water heater (or until piping enters an insulated wall or slab). <br />Shower Heads 612.1 Water flow must be restricted to no more than 3 gallons per minute at 80 PSIG. <br />HVAC Duct 610.1 All ducts, fittings, mechanical equipment and plenum chambers shall be mechanically attached, <br />Construction, sealed, insulated and installed in accordance with the criteria of Section 610.1. Ducts in attics must be <br />Insulation & Installation insulated to a minimum of R-6. Air handlers shall not be installed in attics unless In mechanical closets. <br />HV AC Controls 607.1 Separate readily accessible manual or automatic thermostat for each system. <br /> <br />GENERAL DIRECTIONS: <br />1. On Table 6C-1 indicate the R-value of the insulation being added to each component and the efficiency levels of the equipment being installed. All R-values and efficiencies installed must meet or exceed the minimum values <br />listed. Gomponents and equipment neither being added nor renovated may be left blank. <br />2. ADDmONS ONLY. Determine the percentage 01 new glass to conditioned floor area in the addition as follows. Total the areas of all glass windows, sliding glass doors and glass door panels. Double the area of all non. <br />vertical roof glass and add rt to the previous total. When glass in existing exterior walls is being removed or enclosed by the addition, an amount equal to the total area of this glass may be subtracted from the total glass area <br />Divide the adjusted glass area total by the conditioned floor area of the addition. Multiply by 100 to get the percent. Find the largest glass percentage under which your calculated percentage falls on Table 6C-2. Prescriptives <br />are given by the type of glass (Single or Double pane) and the overhang (OH) paired with a shading coefficient (SC). For a given glass type and overhang, the minimum shading coefficient allowed is specified. Actual glass <br />windows and doors previously in the exterior walls of the house and being reinstalled in the addition, do not have to comply with the overhang and shading coefficient requirements on Table 6C.2. All new glass in the addition <br />must meet the requirement for one of the options in the glass percentage category you indicated. The overhang (OH) distance is measured perpendicularly from the lace of the glass to a point directly under the outermost edge <br />of the overhang. <br />3. RENOVATIONS ONLY. Replacement glass needs to meet the following requirements. Any giass type and shading coefficient may be used for glass areas which are under at least a two foot overhang and whose lowest <br />edge does not extend further than 8 feet from the overhang. Glass areas being renovated that do not meet this criteria must be either single-pane tinted, double-pane clear or double-pane tinted. <br />4. Complete the information requested on the top half 01 page 1. <br />5. Read "Minimum Requirements for Small Additions and Renovations., Table 6C-3, and check all applicable items. <br />6. Read, sign and dale the "Owner/Agenr certification Slalemenl on page 1. <br /> <br />-2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.