Laserfiche WebLink
<br /> <br />Cnrnrnerc;31 & Residential Installation <br /> <br />October 3, 1997 <br /> <br />Precise Construction, Inc. <br />10702 Bloomingdale Blvd. <br />Brandon, Fl, 33501 <br /> <br />..------' <br /> <br />Attention: Mr. Joe Harless, Project Manger <br /> <br />Re: Radiation Oncology Center <br />Zephyrh ill s, F 1. ' <br /> <br />Landscape Installation <br /> <br />5 Crape r'1yrtle <br />3 Hax ~1yrt 1 e <br />8 Li ve Oak <br />142 Glossy Ligustrum <br />48 Formosa Azalea <br />30 Gird of Paradise <br />6 Yds, Planting Soil <br />18 Yds. Cypress Mulch <br />16 Tree Staking <br /> <br />Total Landscape <br /> <br />Irrigation Installation <br /> <br />8IHt., Hz" Cal., 30 Gal. <br />71-81 Ht., 30 Gal. <br />1010AH, 2" Cal" 30 Gal. <br />24" lit., 3 Gal. <br />18"-24", 3 Gal. <br />18"-24",3 Gal. <br /> <br />2" Thick <br /> <br />@ $140.00 <br />@ 140.00 <br />@ 150.00 <br />@ 8.00 <br />@ 8,00 <br />@ 17.00 <br />@ 18.00 <br />@ 27,00 <br />@ 15.00 <br /> <br />$700.00 <br />420.00 <br />1200.00 <br />1136.00 <br />384.00 <br />510,00 <br />108.00 <br />486.00 <br />240.00 <br /> <br />$5184.00 <br /> <br />$2303,00 <br /> <br />Electrical to be supplied by others. <br />Cutting of asphalt not included, if applicable <br />Rough Grade should not exceed 1/10 high/low. <br />Any extra work with grade will be an additional charge per hour. <br />Meter t)y others. <br />Designed based on 1" meter. Controller wiring based on timer location inside back <br />door entrance. <br /> <br />Sod Installation <br /> <br />Approx, 20,000 sq. ft. <br />Note: Hew ill provide <br />additional fee will be <br /> <br />Argentine Bahia Sod <br />scheduling of sod, if paper work <br />added, Actual Footage installed <br />"Qualily in Planls, Service find Designing" <br /> <br />@ $.15 $3,000,00 <br />handled thru our office an <br />I'd 11 be bill ed , <br />