Laserfiche WebLink
<br />BUILDING PE_RMIT- <br /> <br />CITY OF ZEPHYRHILLS <br />(813) 788-6611 <br /> <br />Permit <br /> <br />80958 <br /> <br />Date <br /> <br />/I//O/Cf)( <br /> <br />B~ <br />PmpertyOwne, c~7~~~, ~ ::::,::,:, <br />JobAdd~ss ;t~<so "i. '-~'_( 'q' i<k~4 ~HF" <br />Parcell.D, # _ _ _~ '-'- . ,~r I <br />Zoning: Energy Code: <br />f 0dili' -/ ?~rj L<J JzrQ~ <br /> <br />as-DO <br />ELECTRICAL <br /> <br />PLU~ <br /> <br />MECH~AL <br /> <br />Sewer Conn <br /> <br />Radon Gas: <br /> <br />Description of Work <br /> <br />,,\\;- ce..6 Sh.tr\l\A..t ~ WlEA - (O".35oM <br /> <br />NO OCCUPANCY BEFORE C.O. <br /> <br />bo-\D... 'u-ts ~d. ~ . <br />FINAL <br /> <br />C.O. <br /> <br /> <br />1 <br /> <br />DATE <br /> <br />Complete Plans. Specifications and Fee Must Accompany Application, <br />All work shall be performed in accordance with City Codes and Ordinances. <br /> <br />DATE <br /> <br />Inspector ~ob <br /> <br />i D :f <br /> <br />Z~::,:e (J .~ <br /> <br />Company <br />Address <br />~ephone# 7-fiK- ;).J l/.5 <br /> <br />Valuation or <br />Contract Price <br /> <br />City License Registration # <br />State Certified License# <br /> <br />BUILDING <br /> <br />{kD", ~ J 'CtRd. <br />Ig <br />ELECTRICAL <br /> <br />PLUMBING <br /> <br />MECHANICAL <br /> <br />Breakers <br />Ducts Insl. <br /> <br />Compressor <br />Final <br /> <br />SLB <br />Tub Set <br />Water <br />Sewer <br />Final <br /> <br />Tp, Serv, <br />Rough In <br />Meter Can <br />Con st. Pole <br />Pool <br />Pre-Meter <br />Final <br /> <br />Ftr. <br />Pre SLB <br />Lintel <br />FRM. <br />Insul. CL <br />WL <br /> <br />Driveway <br /> <br />REINSPECTION FEES: When extra inspection trips are necessary due to anyone of the following reasons, a <br />charge of Fifteen and 00/100 Dollars ($ 25.00 I shall be made for each trip for each trade: <br /> <br />a, Wrong Address <br />b, Condemned work resulting from faulty construction. <br />c. Repairs or corrections not made when inspection called. <br />d, Work not ready for inspection when called. <br />e. Permit not posted on job site. <br />f, Plans not at job site, <br />g. Work not accessible, <br /> <br />The payment of inspection fees shall be made before any further permits will be issued to the person owning <br />same, <br />