Laserfiche WebLink
<br />TYPE 1 <br /> <br />CONTROLS <br />NO. TYPE 2 <br /> <br />TOTAL EQUIVALENT <br />CONTROL POINTS' <br />NO. DESIGN CRITERIA <br /> <br />SPACE <br />NO. DESCRIPTION <br /> <br />NO. <br />AREA TASKS <br /> <br /> I <br />26 Reading, T 1135.2 1 On/Off 6 0 6 > 2 <br />2 Corridor 264.0 1 Security 0 0 0 = 0 <br />13 Toilet and 91.0 1 On/Off 2 0 2 = 2 <br />26 Reading, T 1350.0 1 On/Off 4 0 4 > 2 <br />2 Corridor 157.0 1 Security 0 0 0 = 0 <br /> , I <br /> <br />******** PASSES ******** <br /> <br />PROJECT TITLE : <br />BUILDING TYPE : <br />BUILDING LOCATION : <br />BUILDING AREA(ft2): <br /> <br />Second Floor Buildout <br />Business (Office) <br />POLK COUNTY <br />5734 <br /> <br />HVAC SYSTEM REQUIREMENTS: <br /> <br /> I I I I . <br />Cooling System Measure Minim. Minim. System System Result Result <br /> Type #1 #2 #1 #2 Eff.#l Eff.#2 for #1 for #2 <br />Split Sys. SEER 10.00 0.00 10.50 0.00 PASSES <br />Split Sys. SEER 10.00 0.00 10.00 0.00 PASSES <br />Heating System Measure Minimum Req. Efficiency Result <br />Ele. Resis. Et 20.00 N/A <br />Ele. Resis. Et 20.00 N/A <br /> <br />******** PASSES ******** <br /> <br />AIR DISTRIBUTION SYSTEM INSULATION REQUIREMENTS: <br /> <br />Zone # Duct Location <br /> <br />Minimum R-Value <br /> <br />Design R-Value <br /> <br />Result <br /> <br />1. Ventilated <br />2. Ventilated <br /> <br />6.00 <br />6.00 <br /> <br />6.00 <br />6.00 <br /> <br />PASSES <br />PASSES <br /> <br />******** PASSES ******** <br /> <br />PROJECT TITLE <br />BUILDING TYPE <br />BUILDING LOCATION <br />BUILDING AREA(ft2): <br /> <br />Second Floor Buildout <br />Business (Office) <br />POLK COUNTY <br />5734 <br /> <br />WATER HEATING SYSTEM REQUIREMENTS <br /> <br /> 'Measure I I I <br />System Minimum Maximum Design Design Result <br />Type EF / Et SL EF / Et SL <br /> <br />**** Not Applicable **** <br /> <br />PIPING INSULATION REQUIREMENTS: <br />