My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
98-7823
Zephyrhills
>
Building Department
>
Permits
>
1998
>
98-7823
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2009 3:16:25 PM
Creation date
8/25/2006 6:55:56 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
98-7823
Building Department - Name
BABER,BONNIE
Address
38712 1ST AV
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Proposal <br /> <br />St.Joseph Construction, Inc. Date: May 27,1998 <br />31832 Sylvian Lane To: Boonie Baker <br />Dade City, FL 33525 Add_: 38712 1st Ave. <br />Lie. No. CBC045234 Zephyrhills, FL33540 <br />Phone No. (352) 588-2933 Phone No.: 788-6596 <br />Project Name: Repair tree damage <br />Good Until: 30 Days <br /> <br />We propose to furnish all labor and materials necessary to complete the following; <br />$2043.00 Install 4 new trusses, replace damaged sheating, replace broken sub-fascia <br />and damaged al. fascia and soffit_ <br />Install new drywall ceiling and texture to match existing, <br />Paint ceiling, <br />Disconnect all wiring and re'connect after trusses are installed <br />Remove AC ducts required to install new trusses, install 2 new ducts. <br />Re roof entire house roof with 20 year fiberglass shingles inculding ridge <br />vent. <br />$ 245.00 . Install pew gutter on rear of house. <br />$ 325 00 ReiDsulate ceiling over bedrooms . <br />$6398.00 TOtAL <br />We propose to furnish all labor and materials, complete in accordance with the drawings <br />and specifications submitted for the above work and in a workmanlike manner for the sum <br />of six thousand three hundred ninty eight and 00/100 Dollars $ 6,398.00 <br /> <br />- . <br /> <br />$ 480.00 <br />$ 180.00 <br />$ 325.00 <br />$ 395.00 <br />$2640.00 <br /> <br />with payments made as fo~ows: <br /> <br />20% upon acceptance <br />80% upon completion <br /> <br />$1280.00 <br />$5118.00 <br /> <br />Any altention or deviation from ~ specifications involving extra <lOIIts will be executed only up<n written change orden, and will <br />become an ICldla cbargc ovec aad.~ the estimate. All ~ tnntingnt upon strikes, aocideots. or delays beyond our oonIrol <br />Owner to cany fire, tornado, aad~ iosurance upon above work. Workman's ~ and Gmera1 Uabilily IDsuraoce on above <br />ork to betakm out by St. ~Coastruction, Inc._ <br /> <br /> <br />eodore Gude <br /> <br />Date: cfz.. ?/9r <br /> <br />'f,' <br /> <br />Acc~ptance of proposal - The above price, specifications, and ronditions are satisfactory <br />and hereby accepted. You are authorized to do the work as specified. Payment will be <br />made as outlined ab~_ ~ <br /> <br />Owners signature' I{ )!)?~0'l~A -- Date: <br />Property Parcel I.D.-1L- z e - z. J - O~I 0 - ZJ z. (\() - O~, 0 <br />. <br /> <br /> <br />.. <br /> <br />/- <br /> <br />"',-...,....."......-.. <br />
The URL can be used to link to this page
Your browser does not support the video tag.