Laserfiche WebLink
<br />Department of Community Affairs <br />FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION <br />Residential Whole Building Performance Method A <br />WEDGEWOOD MANOR BUILDER: RYMAN CONSTRUCTION CO. <br />PERMITTJ~ _ j _ 1./11 ~ CLIMATE ./ <br />ZEPHYRHILLS, FL 3354 OFFICE: .~~ ZONE: 41-=-1 51_1 61_1 <br />OWNER: beec..h - PERMIT. . ?f3YB JURISDICTION NO.tllfooD <br /> <br />1. New ~~2~U~~~ion 1. New Construction CK <br />2. Single family detached or Multifamily attached 2. Single-Family <br />3. If MUltifamily-No. of units 3. 0 <br />4. If Multifamily, is this a worst case (yes/no) 4. <br />5. Conditioned floor area (sq.ft.) 5. 1436.00 <br />6. Predominant eave overhang (ft.) 6. 1.50 <br />7. Porch overhang length (ft.) 7. 0.00 <br />8. Glass area and type: Single Pane <br />a. Clear Glass 8a. O.Osqft <br />b. Tint, film or solar screen 8b.182.4sqft <br />9. Floor type and insulation: <br />a. Slab on grade (R-value, perimeter) <br />10.Net Wall type area and insulation: <br />a. Exterior: 1. Concrete (Insulation R-value) 10a-1 R= 5.00, 898.44sqft____ <br />b. Adjacent: 2. Wood frame (Insulation R-value) 10b-2 R=11.00, 230.40sqft____ <br />11.Ceiling type area and insulation: <br />a. Under attic (Insulation R-value) <br />12.Air distribution systems <br />a. Ducts (Insulation + Location) <br />13.Cooling system <br /> <br />.. <br /> <br />FG:-i"\'f 600A-93 <br />PROJECT NAME: <br />AND ADDRESS: <br /> <br />14.Heating System: <br /> <br />15.Hot water system: <br /> <br />16.Hot Water Credits: (RR-Heat Recovery, <br />DHP-Dedicated Heat Pump) <br />17. Infiltration practice: 1, 2 or 3 <br />18.HVAC Credits (CF-Ceiling Fan, CV-Cross vent, <br />HF-Whole house fan, RB-Attic radiant <br />barrier, MZ-Multizone) <br />19.EPI (must not exceed 100 points) <br />a. Total As-Built points <br />b. Total Base points <br /> <br />SN: 813~ <br /> <br />CENTRAL <br /> <br />Double Pane <br />O.OOsqft <br />O.OOsqft <br /> <br />9a.R= 0.00 , 168.60 ft <br /> <br />11a.R=22.00 , 1436.00sqft____ <br /> <br />12a. R= 6.00, uncond <br />13. Type: Central A/C <br />SEER: 9.70 <br />14. Type: Heat Pump <br />HSPF: 6.60 <br />15. Type: Electric <br />EF: 0.88 <br /> <br />16. <br /> <br />17. <br />18. <br /> <br />2 <br /> <br />19. <br />19a. <br />19b. <br /> <br />90.31 <br />23633.95 <br />26168.74 <br /> <br />------------------------------------------------------------------------------- <br /> <br />-----------------------------------------------------------------------------.-- <br /> <br />Review of the plans and specifications <br />covered by this calculation indicates <br />compliance with the Florida Energy <br />Code. Before construction is completed <br />this building will be inspected for <br />compliance in accordance with Section <br />553.908 F.S. <br /> <br />I Hereby certify that the plans and <br />specifications covered by this calcu- <br />lation are in com' with the <br />Florida En~gy'-' ode/. <br /><:~, ./ _/ <br />PREPA..n'C'n .., <br />DATE:~\. '9 <br /> <br />I hereby certify that this building is <br />in compliance w lorida Energy <br />Code. <br /> <br /> <br /> <br /> <br />BUILDING <br />DATE: <br /> <br /> <br />/ <br />