Laserfiche WebLink
<br />BUILDING PERMIT <br /> <br />CITY OF ZEPHYRHILLS <br />(813) 788-6611 <br /> <br />Permit <br /> <br />8175 <br /> <br />:(S " t5J <br />BUILDING E~ICAL PL~NG <br /> <br />Property Owner: r'a"i.e... ~ ~ ~A-~ <br />Job Address: 5" / 31 / <f ~ 5+ . <br /> <br />Date <br /> <br />i;;jq,/q g' <br /> <br />MEC~AL <br /> <br />Sewer Conn <br />Water Conn: <br /> <br />Water Meter: <br />T.I.F.'s: <br /> <br />Parcell.D. # <br /> <br />Zoning: <br />Descriotion of Work <br /> <br />Energy Code: <br />~~CL <br /> <br />Radon Gas: <br /> <br />NO OCCUPANCY BEFORE C.O. <br /> <br />FINAL <br /> <br /> <br />Complete Plans, Specifications and Fee Must Accompany Application. C.O. <br />All work shall be performed in accordance with City Codes and Ordinances. <br /> <br />DATE <br /> <br />City License Registration # <br />State Certified License# <br /> <br />Permit Fee <br />et9nature <br />Company <br />Address <br />~Iephone# <br /> <br /> <br />Valuation or <br />Contract Price <br /> <br />5Jv,;)u <br /> <br />()~ <br /> <br />BUILDING <br /> <br />ELECTRICAL <br /> <br />PLUMBING <br /> <br />MECHANICAL <br /> <br />Ftr. <br />Pre SLB <br />Lintel <br />FRM. <br />Insul. CL <br />WL <br /> <br />Tp. Servo <br />Rough In <br />Meter Can <br />Const. Pole <br />Pool <br />Pre-Meter <br />Final <br /> <br />SLB <br />Tub Set <br />Water <br />Sewer <br />Final <br /> <br />Breakers <br />Ducts Insl. <br /> <br />Compressor <br />Final <br /> <br />Driveway <br /> <br />REINSPECTION FEES: When extra inspection trips are necessary due to anyone of the following reasons, a <br />charge of Fifteen and 00/100 Dollars ($ 25.001 shall be made for each trip for each trade: <br /> <br />a. Wrong Address <br />b. Condemned work resulting from faulty construction. <br />C. Repairs or corrections not made when inspection called. <br />d. Work not ready for inspection when called. <br />e. Permit not posted on job site. <br />f. Plans not at job site. <br />g. Work not accessible. <br /> <br />The payment of inspection fees shall be made before any further permits will be issued to the person owning <br />same. <br />