My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
99-8979
Zephyrhills
>
Building Department
>
Permits
>
1999
>
99-8979
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2009 4:08:20 PM
Creation date
9/6/2006 8:27:58 AM
Metadata
Fields
Template:
Building Department
Permit #
99-8979
Building Department - Name
JEFFERIES,ROGER
Address
6205 ZEPHYR RIDGE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />BUILDING PE,RMIT <br /> <br />/""" <br /> <br />CITY OF ZEPHYRHILLS <br />(813) 788-6611 <br /> <br />Permit <br /> <br />8979 <br /> <br />(p,!f' <br /> <br />Date <br /> <br />11- (j-jf <br />I <br /> <br />BUILDING <br /> <br />~L ~ <br />Pmp,rty Dwn" '~~ ~7t- ~ <br />Job Address: tp ,2 0 11 ~ <br />P,,""O..1-.1 ~.z ~ o/~'-~oo~;/ <br /> <br />M.E.Ct.+A'mC"AL <br /> <br />Sewer Conn <br />Water Conn: <br /> <br />Water Meter: <br />T,I.F.'s: <br /> <br />Zoning: <br />Description of Work <br /> <br /> <br />NO OCCUPANCY BEFORE C.O. <br /> <br />FINAL <br /> <br />12--1-7> <br />DATE <br /> <br />Complete Plans, Specifications and Fee Must Accompany Application. C.O. <br />All work shall be performed in accordance with City Codes and Ordinances. <br /> <br />Inspector <br />Permit Fee / 6 75, <br />~-;~y~./ ~ \~~~~ <br /> <br />Company <br /> <br />~~ ~\ ~ 11g-d- ~~<'c' f, <br /> <br /> <br />o i1V <br />15) S/fS' - <br /> <br />City License Registration # ~ 3 <br />State Certified License# <br /> <br />Valuation or <br />Contract Price <br /> <br />O(!J OJj//YJ1. <br /> <br />BUILDING EL~AL <br /> <br />tJ/~ ;:;n~P, SON, - <br />/. ~~OU9h In <br />Meter Can <br />Const. Pole <br />Pool <br />Pre-Meter <br /> <br />I {;/ ~_ '19 tj}nal <br /> <br />PLU~G <br />- <br /> <br />~- <br />- <br /> <br />Ftr. <br />Pre SLB <br />Lintel <br /> <br />FRM. <br />Insul. CL <br />WL <br /> <br />SLB <br />Tub Set <br />Water <br />Sewer <br />Final <br /> <br />Breakers <br />Ducts Insl. <br /> <br />Compressor <br />Final <br /> <br />Driveway <br /> <br />REINSPECTION FEES: When extra inspection trips are necessary due to anyone of the following reasons, a <br />charge of Fifteen and 00/100 Dollars ($ 25.001 shall be made for each trip for each trade: <br /> <br />a. Wrong Address <br />b. Condemned work resulting from faulty construction. <br />c. Repairs or corrections not made when inspection called. <br />d. Work not ready for inspection when called. <br />e. Permit not posted on job site. <br />f. Plans not at job site. <br />g. Work not accessible. <br /> <br />The payment of inspection fees shall be made before any further permits will be issued to the person owning <br />same. <br />
The URL can be used to link to this page
Your browser does not support the video tag.