Laserfiche WebLink
<br />DATE TYPE OF INSPEcnON PASSED FAILED INSPECTOR <br />1/20/00 Footer X Squire <br />1/20/00 Construction Pole X Squire <br />1/21/00 Footer X Squire <br />1/24/00 Footer Canceled <br />1/27/00 1st. Rough Plumb X Squire <br />1/28/00 Footers X Squire <br />1/31/00 Partial underground electric X Squire <br />2/1/00 Partial underground electric X Squire <br />2/1/00 Fill cell X Squire <br />2/2/00 Fill cell X Squire <br />2/3/00 Fill cell X Squire <br />2/4/00 Fill cell X Squire <br />2/4/00 Partial underground electric X Squire <br />2/7/00 Fill cell X Squire <br />2/8/00 Column Steel X Squire <br />2/10/00 Slab X Squire <br />2/14/00 P.I.P. Beam X Squire <br />2/15/00 P .I.P. Beam X Squire <br />2/16/00 P.I.P. Beam X Squire <br />2/16/00 Joist Beam X Squire <br />2/23/00 Slab X Squire <br />3/9/00 Mechanical duets X Squire <br />3/15/00 Rough mechanical X Squire <br />3/17/00 Partial frame X Squire <br />3/17/00 Elec. Drive thru X Squire <br />3/21/00 2nd Rough plumb X Squire <br />3/21/00 Partial elec. X Squire <br />3/22/00 2nd Rough plumb X Squire <br />4/3/00 Framing X Squire <br />4/3/00 Rough electric X Squire <br />4/17/00 Partial elec. X Squire <br />4/18/00 Roff dry-in for tile X SqUire <br />4/19/00 Service X Squire <br />4/20/00 Above ceiling electrical X Squire <br />4/20/00 Above ceiling mechanical X Squire <br />5/2/00 Construction Final X Squire <br />